BLD03-00785
| BLD-Aging Inspection | 7/17/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | | CANC |
|
|
exp 10/12/03 7/17/2003 11:56:56 AM
|
BLD03-00799
| BLD-Aging Inspection | 7/17/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | | CANC |
|
|
exp 10/12/03 7/17/2003 11:54:18 AM
|
MIS03-00071
| MIS-Aging Inspection | 7/17/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | | CANC |
|
|
exp 10/12/03 7/17/2003 10:59:57 AM
|
BLD03-01402
| BLD-Foundation | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | A | NR |
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. No one here and no forms in place ?. 7/17/2003 10:45:13 AM
|
BLD03-01412
| BLD-Foundation | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | A | PASS |
|
|
pat; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD03-01048
| BLD-Framing/Rough-in | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | A | FAIL |
|
|
adam; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Prior c/n ok except bath fan ducts not conected to fans posted c/n. 7/17/2003 10:32:45 AM
|
BLD02-03001
| BLD-Framing/Rough-in | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | A | PART |
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Med; Phone #: ###-#### Internet Inspection Request from: Marsha Smylied; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie, needs special inspection letter of completion and engineers letter./17/2003 2:12:14 PM 7/17/2003 2:13:02 PM
|
BLD02-02999
| BLD-Framing/Rough-in | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | A | PART |
|
|
ed; Phone #: ###-#### Internet Inspection Request from: Marsha Smylied; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie, needs special inspection letter of completion and engineers letter.e, needs special inspection letter of completion and engineers letter. 7/17/2003 2:12:14 PM 7/17/2003 2:12:28 PM
|
BLD03-00800
| BLD-Final | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | A | PASS |
|
|
ian; Phone #: ###-#### Internet Inspection Request from: Dixie Fellows
|
MIS03-00138
| BLD-Final | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | A | NH |
|
|
JIM ,THIS IS A HOME PURCHASE : PLEASE CALL JOHN OR LORA AT ###-#### 1-HOUR BEFORE GOING OUT SO THAT THEY CAN BE THERE TO LET YOU IN... I called this number and the river rock ale house answered said thay had a john that worked there but not there now. 7/17/2003 10:56:42 AM
|
MEC03-00625
| Pressure Test | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | P | CANC |
|
|
Phone #: ###-#### Internet Inspection Request from: Liz Sasser (Did this yesterday) and passed infact guage still has 60 psi.. 7/17/2003 2:23:56 PM
|
MEC03-01866
| Rough-in | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 7/16/2003 at 10:03:19 AM. Contact: ###-####.
|
MEC03-01866
| Final | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 7/16/2003 at 10:03:55 AM. Contact: ###-####.
|
MEC03-01866
| Pressure Test | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 7/16/2003 at 10:04:17 AM. Contact: ###-####.
|
MEC03-00624
| Pressure Test | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Liz Sasser. Note line has been relocated , but now guage only has 5 psi. 7/17/2003 2:23:09 PM
|
BLD02-01072
| BLD-Framing/Rough-in | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | P | FAIL |
|
|
morgan ###-#### fire caulking , Cut floor joist under tubs, holes under tub need fire caulk,4x4 paralam beams shown on 1st and second floor levels, not in place need architect ok for as built, mis fire caulking and drywall modifications walked with contractor wrote some notes on doors at the units. no c/n to many units. 24 total. 7/18/2003 12:15:58 PMmorgan ###-#### fire caulking , Cut floor joist under tubs, holes under tub need fire caulk,4x4 paralam beams shown on 1st and second floor levels, not in place need architect ok for as built, mis fire caulking and drywall modifications walked with contractor wrote some notes on doors at the units. no c/n to many units. 24 total. 7/18/2003 12:16:12 PM
|
BLD02-02718
| BLD-Framing/Rough-in | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | P | FAIL |
|
|
morgan- ###-####morgan ###-#### fire caulking , Cut floor joist under tubs, holes under tub need fire caulk,4x4 paralam beams shown on 1st and second floor levels, not in place need architect ok for as built, mis fire caulking and drywall modifications walked with contractor wrote some notes on doors at the units. no c/n to many units. 24 total. 7/18/2003 12:15:58 PMmorgan ###-#### fire caulking , Cut floor joist under tubs, holes under tub need fire caulk,4x4 paralam beams shown on 1st and second floor levels, not in place need architect ok for as built, mis fire caulking and drywall modifications walked with contractor wrote some notes on doors at the units. no c/n to many units. 24 total. 7/18/2003 12:16:17 PM
|
BLD03-01711
| BLD-Framing/Rough-in | 7/17/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | P | CANC |
|
|
please call an hour prior ro going Duane; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD02-02720
| BLD-Conference | 7/18/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | P | PART |
|
|
shear ok. 7/18/2003 12:19:44 PM
|
BLD02-01070
| BLD-Framing/Rough-in | 7/18/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | P | PART |
|
|
shear ok. 7/18/2003 12:19:53 PM
|