FIR03-00090
| INSP-Sprinkler Rough-in | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | A | PART |
|
|
jan ###-#### inspection was for coverage of sprinkler piping above the hard lid areas. Sprinkler piping is OK to cover in these areas as marked on the city approved sprinkler plans. 7/17/2003 11:00:11 AM
|
FIR02-00452
| INSP-Final Inspection | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/16/2003 at 1:27:10 PM. Contact: ###-####.
|
FIR03-00186
| INSP-Sprinkler Rough-in/Hydro | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | A | PART |
|
|
above ground hydro test is ok. Need test papers. Forward flow flush test is OK. Rough-in for office area is OK except for the combustible concealed spaced created by the mechanical mezzanine. Upright sprinkler heads will need to be added. All shop areas need looked at. 7/17/2003 4:10:51 PM
|
BLD02-03053
| FIRE-Final Inspection | 7/16/2003 | 7/17/2003 | 7/17/2003 12:00:00 AM | P | FAIL |
|
|
###-#### jed Provide the second fire hydrant as per plan sheet C1.0. Provide automatic shutdown for the hvac units. Provide "No Parking-Fire Dept. Turn Around" sign on fence between builidings. Provide approved door hardware on doors for access to the common restrooms and conference room 7/17/2003 4:18:41 PM
|