ESC06-00136
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 4:17:07 PM | P | PASS |
|
|
CAS
|
ESC07-01601
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 3:33:37 PM | P | PASS |
|
|
Lots and street are stabilized. CAS
|
ESC07-01600
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 3:32:58 PM | P | PASS |
|
|
Lots and street are stabilized. CAS
|
ESC07-01599
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 3:32:32 PM | P | PASS |
|
|
Lots and street are stabilized. CAS
|
BLD08-01396
| BLD-Conference | 7/17/2008 | 7/17/2008 | 7/17/2008 2:40:27 PM | P | DONE |
|
|
A stop work order was issued for all exterior work on the project. No exterior was can take place until a ESC permit is issued for the BLD08-01396. Only interior work is allowed until an ESC permit is issued. CAS 460
|
ESC06-01690
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 1:43:09 PM | P | PASS |
|
|
Work is completed. Site is stabilized. CAS
|
ESC07-00067
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 1:41:52 PM | P | FAIL |
|
|
Not ready yet
|
ESC07-00068
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 1:41:21 PM | P | FAIL |
|
|
Not ready yet.
|
ESC07-00085
| General Inspection | 7/17/2008 | 7/17/2008 | 7/17/2008 1:29:46 PM | P | PASS |
|
|
Work is completed. Site is stabilized. CAS
|
ESC07-00120
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 1:28:28 PM | P | PASS |
|
|
Work is completed. Site is stabilized. CAS
|
ESC07-00100
| General Inspection | 7/17/2008 | 7/17/2008 | 7/17/2008 1:14:15 PM | P | PASS |
|
|
Work still in progress. CAS
|
ESC07-00060
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 1:07:07 PM | A | PASS |
|
|
Work is completed. Site is stabilized. CAS
|
ESC07-00076
| General Inspection | 7/17/2008 | 7/17/2008 | 7/17/2008 10:59:47 AM | P | PASS |
|
|
Site not active site is stabilized.
|
ESC07-00023
| General Inspection | 7/17/2008 | 7/17/2008 | 7/17/2008 10:43:24 AM | A | PASS |
|
|
|
ESC07-00023
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:43:04 AM | A | PASS |
|
|
Work is completed. Site is stabilized. CAS
|
ESC07-00024
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:42:42 AM | A | PASS |
|
|
Work is completed. Site is stabilized. CAS
|
ESC07-00025
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:42:27 AM | A | PASS |
|
|
Work is completed. Site is stabilized. CAS
|
ESC07-00025
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:42:06 AM | A | PASS |
|
|
Work is completed. Site is stabilized. CAS
|
ESC07-00026
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:41:53 AM | A | PASS |
|
|
Work is completed. Site is stabilized. CAS
|
ESC07-00027
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:41:33 AM | A | PASS |
|
|
Work is completed. Site is stabilized. CAS
|
ESC07-00028
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:41:19 AM | A | PASS |
|
|
Work is completed. Site is stabilized. CAS
|
ESC07-00032
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:23:40 AM | A | PASS |
|
|
Work completed.
|
ESC07-00043
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:23:17 AM | A | PASS |
|
|
Work completed.
|
ESC07-00031
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:23:00 AM | A | PASS |
|
|
Work completed.
|
ESC07-00030
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:22:43 AM | A | PASS |
|
|
Work completed.
|
ESC07-00042
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:22:29 AM | P | PASS |
|
|
Work completed.
|
ESC07-00041
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:22:11 AM | A | PASS |
|
|
Work completed.
|
ESC07-00041
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:21:51 AM | A | PASS |
|
|
Work completed.
|
ESC07-00039
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:21:30 AM | A | PASS |
|
|
Work completed.
|
ESC07-00037
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:21:14 AM | A | PASS |
|
|
Work completed.
|
ESC07-00030
| General Inspection | 7/17/2008 | 7/17/2008 | 7/17/2008 10:19:50 AM | A | DEFR |
|
|
Moved to a site final.
|
ESC06-00949
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:09:06 AM | A | PASS |
|
|
Work completed.
|
ESC06-00948
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:08:33 AM | P | PASS |
|
|
Work completed.
|
ESC06-00947
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:08:11 AM | A | PASS |
|
|
Work completed.
|
ESC07-00059
| Site Final | 7/17/2008 | 7/17/2008 | 7/17/2008 10:04:19 AM | A | PASS |
|
|
|
ESC07-00109
| General Inspection | 7/17/2008 | 7/17/2008 | 7/17/2008 9:43:02 AM | P | PASS |
|
|
Total area is stabilized and on hold. No issues present. CAS
|
ESC08-00116
| General Inspection | 7/17/2008 | 7/17/2008 | 7/17/2008 9:25:33 AM | A | FAIL |
|
|
Need to clean up trash debris on the entire lot. Clean D.I. and gutter pan infront of lot. Spoke with Ray (project Super). Will re-inspect on 7/21/08 CAS
|
ESC08-00020
| Site Preparation | 7/17/2008 | 7/17/2008 | 7/17/2008 9:22:56 AM | A | PASS |
|
|
Lot looks good. No issues present. CAS
|
ESC08-00179
| Site Preparation | 7/17/2008 | 7/17/2008 | 7/17/2008 9:00:44 AM | P | PART |
|
|
Post sign at construction entrance. Was told that they cannot use the construction entrance off of Ustick righ now due to the fresh paving. Will start to use it on 7/21/08. Will be cleaning at the end of the day if any tracking oocurs. CAS
|
ESC08-00178
| Tracking Control | 7/17/2008 | 7/17/2008 | 7/17/2008 8:24:53 AM | A | PASS |
|
|
Entrance installed correctly over on the 12th St. side of project. CAS
|
ESC08-00516
| Site Preparation | 7/16/2008 | 7/17/2008 | 7/16/2008 9:34:15 AM | A | PART |
|
|
Spoke with RP over the overall project and gave him a heads up that some type of sediment barrier is needed to procect the canal. They will be installing silt fence as there bmp to protect the canal. Will be removing the trash pile through out the week while demo is being done on the basement. will re-inspect on 7/23/08 CAS
|
ESC08-00480
| Site Preparation | 7/16/2008 | 7/17/2008 | 7/16/2008 8:56:10 AM | A | NR |
|
|
Work has not started. Will re-inapect next week. CAS
|