BLD09-01138
| BLD-Foundation | 7/17/2009 | 7/17/2009 | 7/17/2009 4:54:57 PM | P | PASS |
|
|
Bill Phone #: ###-####
|
BLD09-01138
| BLD-Footing | 7/17/2009 | 7/17/2009 | 7/17/2009 4:48:08 PM | P | PASS |
|
|
bill Phone #: ###-####
|
ESC07-00262
| Site Final | 7/17/2009 | 7/17/2009 | 7/17/2009 2:55:12 PM | P | PASS |
|
|
|
BLD09-00427
| BLD-Final | 7/16/2009 | 7/17/2009 | 7/17/2009 2:54:42 PM | A | PASS |
|
|
Greg Phone #: ###-#### OK for Perm Occ.
|
ESC09-00416
| Site Preparation | 7/17/2009 | 7/17/2009 | 7/17/2009 2:33:41 PM | P | CANC |
|
|
Ray phone
|
BLD09-01093
| BLD-Footing | 7/17/2009 | 7/17/2009 | 7/17/2009 2:33:12 PM | P | CANC |
|
|
jim Phone #: ###-####
|
BLD09-00461
| BLD-Framing/Rough-in | 7/16/2009 | 7/17/2009 | 7/17/2009 12:01:01 PM | A | PART |
|
|
kevin Phone #: ###-#### Went through plans with Brandon....Talked about ADA, Rated walls, firestopping, Shear inspections etc.......Looked at shear walls in crawl (pony walls).....located below entrances to hallways.....OK except for overshot nails, and a panel with missed nailing. Wants to cut a hole or two through pony shear walls.....contact Architect or Eng. for advise.
|
BLD09-00267
| BLD-Concrete | 7/16/2009 | 7/17/2009 | 7/17/2009 10:32:56 AM | A | PART |
|
|
Pouring interior slab patchback section at Phase 1C++ and rat slabs and Produce pad and curbs at 4:00 am Phone #: ###-#### Internet Inspection Request from: Mike Tsu OK pend MTI insp, tests and appr.
|