FIR12-00099
| INSP-Alarm Testing | 7/17/2012 | 7/17/2012 | 7/17/2012 4:40:38 PM | P | PART |
|
|
Completed testing for underfloor SD at zones 8,9,10,11, and 12. Also tested MP stations at the sub fab, first floor electrical, exit stairs, and fire riser rooms. SE riser tampers and flows on systems 5,6, and 9 also tested okay. System 11, MAU's, and second floor initiating devices are not yet ready for inspection. Discussed schedule for notification testing at the clean room fab area.
|
BLD12-00773
| FIRE-Final Inspection | 7/17/2012 | 7/17/2012 | 7/17/2012 2:25:58 PM | P | PASS |
|
|
Correction items finished. Life safety passed.
|
BLD12-01055
| FIRE-Conference | 7/17/2012 | 7/17/2012 | 7/17/2012 12:29:15 PM | A | DONE |
|
|
Regarding project related FIR trade work.
|
BLD12-00595
| FIRE-Final Inspection | 7/16/2012 | 7/17/2012 | 7/17/2012 12:28:27 PM | A | PASS |
|
|
C/N item completed. Inspection passed, no signature card available on site.
|
FIR12-00332
| INSP-Sprinkler Rough-in | 7/16/2012 | 7/17/2012 | 7/17/2012 12:27:14 PM | A | PART |
|
|
Additional fittings and changes in pipe routing for the underground supply line verified with plan review as within calcs. Verified corrections for bedding, okayed for bury.
|