PLM15-02367
| Final | 7/16/2015 | 7/17/2015 | 7/17/2015 4:19:42 PM | A | PEND |
|
|
dcva needs tested..........ds
|
PLM15-02394
| Sprinkler (Final) | 7/17/2015 | 7/17/2015 | 7/17/2015 4:17:22 PM | P | PASS |
|
|
|
PLM15-00271
| Final | 7/14/2015 | 7/17/2015 | 7/17/2015 3:13:25 PM | P | PASS |
|
|
Daniel Phone #: ###-####
|
PLM15-02405
| Sprinkler (Final) | 7/17/2015 | 7/17/2015 | 7/17/2015 2:59:57 PM | P | PASS |
|
|
Craig Phone #: ###-####
|
PLM15-01785
| Final | 7/17/2015 | 7/17/2015 | 7/17/2015 2:51:39 PM | P | PASS |
|
|
Please call Troy prior so they can have open or verify homeowner is there Phone #: ###-#### Inspection requested via web by Troy Paulin
|
PLM15-02321
| Water Heater Final | 7/17/2015 | 7/17/2015 | 7/17/2015 2:32:21 PM | P | PASS |
|
|
|
GCP15-00145
| GCP-Final | 7/17/2015 | 7/17/2015 | 7/17/2015 2:07:08 PM | P | PASS |
|
|
|
PLM15-02390
| Water Heater Final | 7/16/2015 | 7/17/2015 | 7/17/2015 1:57:01 PM | P | PASS |
|
|
Please call homeowner, Amber 30 minutes prior to arrival ###-####. Call plumber, Jake for questions ###-####. Phone #: ###-#### Inspection requested via web by James Staley
|
PLM15-02394
| Sprinkler (Final) | 7/16/2015 | 7/17/2015 | 7/17/2015 1:19:33 PM | A | PART |
|
|
Please give me a call ###-#### after the inspection is done thank you! Phone #: ###-#### Inspection requested via web by Arturo Segura not tested
|
GCP15-00145
| GCP-Final | 7/16/2015 | 7/17/2015 | 7/17/2015 1:17:30 PM | A | PART |
|
|
Dave ###-#### - requested early AM insp need to install vent, c/o and test port..........ds
|
PLM13-03470
| Storm Drains | 7/16/2015 | 7/17/2015 | 7/17/2015 11:58:56 AM | A | PART |
|
|
combined rain drain storm system. If questions call Shane @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann finished horizontal tie in to roof drain verticals..........ds
|
PLM15-02339
| Plumbing Rough-in | 7/15/2015 | 7/17/2015 | 7/17/2015 11:40:00 AM | A | PEND |
|
|
Please call Ryan at ###-#### when you are on the way. He will meet you on site. Thanks. Phone #: ###-#### Inspection requested via web by Josh Johnson needs a bld permit.....mis was created and sent to Hannah............ds
|
PLM15-02312
| Final | 7/16/2015 | 7/17/2015 | 7/17/2015 10:48:10 AM | A | PASS |
|
|
preferable if its before 11, since they get busy with lunch. If you have any questions, please call Todd @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann
|
PLM15-01654
| Final | 7/16/2015 | 7/17/2015 | 7/17/2015 10:12:07 AM | A | PASS |
|
|
BRANDON IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
PLM15-01652
| Water and/or Sewer | 7/16/2015 | 7/17/2015 | 7/17/2015 9:50:02 AM | A | PASS |
|
|
Randy Phone #: ###-####
|
PLM15-01652
| DOC - Permit Finaled | 7/17/2015 | 7/17/2015 | 7/17/2015 9:49:36 AM | P | PASS |
|
|
|
PLM15-00623
| PLM-Aging Inspection | 7/17/2015 | 7/17/2015 | 7/17/2015 8:59:12 AM | | NR |
|
|
wip
|