ELE15-02184
| Rough-In Permanent Service | 7/15/2015 | 7/17/2015 | 7/17/2015 3:03:01 PM | P | NR |
|
|
Phone #: ###-#### Inspection requested via web by shane miller contractor not ready will be ready on monday
|
ELE15-01808
| Final | 7/17/2015 | 7/17/2015 | 7/17/2015 2:25:43 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by William Andrews up bed and covered patio final ok
|
ELE15-01809
| Final | 7/17/2015 | 7/17/2015 | 7/17/2015 2:09:01 PM | P | PASS |
|
|
Lynn Phone #: ###-#### final ok
|
GCE15-00113
| GCE-Temporary Service | 7/17/2015 | 7/17/2015 | 7/17/2015 1:29:13 PM | P | PASS |
|
|
Dan Hommell ###-#### t/s o/h rec ok
|
ELE15-02192
| Final | 7/17/2015 | 7/17/2015 | 7/17/2015 1:11:47 PM | P | PASS |
|
|
Inspection requested via web by Dan Hobdey service change final ok
|
ELE15-00233
| Final | 7/14/2015 | 7/17/2015 | 7/17/2015 12:48:11 PM | P | NH |
|
|
Daniel Phone #: ###-#### nobody home left a message with daniel
|
ELE15-01039
| Final | 7/17/2015 | 7/17/2015 | 7/17/2015 12:28:31 PM | P | PASS |
|
|
Inspection requested via web by Spencer McLean final ok
|
ELE15-01039
| Final | 7/16/2015 | 7/17/2015 | 7/17/2015 10:37:58 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Spencer McLean 210.8 (5) receptacles located with 6' of outside edge of a sink shall be GFCI protection/GFCI for water fountain shall be readily accessible
|
ELE15-01667
| Electrical Rough-In | 7/16/2015 | 7/17/2015 | 7/17/2015 9:46:25 AM | A | CANC |
|
|
Please call ###-#### for access directions. We need a statement on city letterhead stating that code upgrades are required due to box fill and wire upgrades are due to wire clearance and insulation emailed to us please. Call above number to discuss. Phone #: ###-#### Inspection requested via web by Kendra Lanham rough-in inspection already complete talk with contractor about emailing code requirements and changes as per NEC
|
ELE15-02112
| Rough-In Permanent Service | 7/16/2015 | 7/17/2015 | 7/17/2015 9:36:21 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman rough-in ok cover p/s u/g n ok
|
ELE15-02200
| Permanent Service | 7/16/2015 | 7/17/2015 | 7/17/2015 9:00:58 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman needed t/s
|
ELE15-02200
| Temporary Service | 7/17/2015 | 7/17/2015 | 7/17/2015 9:00:27 AM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Emmet Bushman t/s o/h n ok
|
ELE15-02192
| Final | 7/16/2015 | 7/17/2015 | 7/17/2015 8:43:12 AM | A | CANC |
|
|
Dan Phone #: ###-#### Inspection requested via web by Dan Hobdey contractor not ready till pm
|