MEC15-03358
| Pressure Test | 7/17/2015 | 7/17/2015 | 7/17/2015 3:18:39 PM | P | PASS |
|
|
Ed Phone #: ###-####-20 lb gas test pass
|
MEC15-03358
| DOC - Permit Finaled | 7/17/2015 | 7/17/2015 | 7/17/2015 3:18:11 PM | P | PASS |
|
|
|
MEC15-03335
| Final | 7/16/2015 | 7/17/2015 | 7/17/2015 2:53:06 PM | P | PASS |
|
|
installer Lupe ###-#### also lockbox 2406 Inspection requested via web by Dustin Rich
|
PLM15-02398
| Plumbing Rough-in | 7/17/2015 | 7/17/2015 | 7/17/2015 2:42:15 PM | P | PEND |
|
|
Please call Troy 30 min prior so they can have it open ###-#### Phone #: ###-#### Inspection requested via web by Troy Paulin-Will pass rough-in when mechanical and electrical permits are issued.
|
PLM15-02230
| Groundwork | 7/17/2015 | 7/17/2015 | 7/17/2015 2:40:54 PM | P | PASS |
|
|
|
MEC15-03336
| Final | 7/16/2015 | 7/17/2015 | 7/17/2015 2:40:48 PM | P | CANC |
|
|
JR ###-#### Phone #: ###-#### Inspection requested via web by Frank Marturello
|
MEC15-03339
| Final | 7/16/2015 | 7/17/2015 | 7/17/2015 1:47:23 PM | P | FAIL |
|
|
Please call homeowner Amber 30 mins prior ###-####. Call plumber Jake for questions ###-#### Phone #: ###-#### Inspection requested via web by James Staley-Need to test flue
|
MEC15-03354
| Pressure Test | 7/16/2015 | 7/17/2015 | 7/17/2015 1:43:29 PM | P | PASS |
|
|
Flue pressure test for high eff furnace installation. Call ahead to Eric @ ###-#### to coordinate inspection time. Phone #: ###-#### Inspection requested via web by Angie Maguire-Flue test pass
|
MEC15-03354
| Final | 7/16/2015 | 7/17/2015 | 7/17/2015 1:40:46 PM | P | NR |
|
|
Call ahead to Tom @ ###-#### or Eric @ ###-#### to coordinate inspection time and verify the install is complete. Phone #: ###-#### Inspection requested via web by Angie Maguire-Not ready
|
MEC15-03367
| Final | 7/17/2015 | 7/17/2015 | 7/17/2015 1:03:44 PM | P | PASS |
|
|
Please Must be between 12:30-3:30 call Sue on way ###-####. Thanks Phone #: ###-#### Inspection requested via web by Allie Courter
|
MEC15-03147
| Final | 7/17/2015 | 7/17/2015 | 7/17/2015 12:43:31 PM | P | CANC |
|
|
James will be ready around 3pm. Please call him when heading his way. Thanks! Phone #: ###-#### >> Inspection requested via web by Brenda St Clair Inspection cancelled from web by: Brenda St Clair
|
PLM15-02395
| Water Heater Final | 7/16/2015 | 7/17/2015 | 7/17/2015 12:37:03 PM | P | PASS |
|
|
Customer gives you permission to enter the home with no one there. Please lock front door when you leave. Thank you. Phone #: ###-#### Inspection requested via web by Nick Drake
|
MEC15-03249
| Final | 7/13/2015 | 7/17/2015 | 7/17/2015 12:26:47 PM | P | PART |
|
|
Installer Tom ###-#### Phone #: ###-#### Inspection requested via web by Dustin Rich-R/I complete
|
PLM15-00087
| Final | 7/16/2015 | 7/17/2015 | 7/17/2015 11:13:27 AM | A | PART |
|
|
Please call Dave. Thank You! Phone #: ###-#### Inspection requested via web by Rhonda Marcum-Units 203 thru 216 final ok
|
PLM15-00034
| Final | 7/17/2015 | 7/17/2015 | 7/17/2015 10:54:41 AM | A | PART |
|
|
Units 400 thru 410 final ok
|
PLM15-02062
| Plumbing Rough-in | 7/16/2015 | 7/17/2015 | 7/17/2015 10:37:16 AM | A | PASS |
|
|
JOSH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER
|
MEC15-02835
| Pressure Test | 7/15/2015 | 7/17/2015 | 7/17/2015 10:35:55 AM | A | PASS |
|
|
JOSH IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER-60 lb gas test pass
|
PLM15-02259
| Water and/or Sewer | 7/16/2015 | 7/17/2015 | 7/17/2015 10:34:28 AM | A | PART |
|
|
Sewer; Baker Phone #: ###-####-Gravity sewer pass
|
PLM15-02230
| Water and/or Sewer | 7/17/2015 | 7/17/2015 | 7/17/2015 10:23:04 AM | P | CANC |
|
|
Underground plumbing will be ready for inspection at around 3 pm. If you would like you can call before heading out.
Thank you Phone #: ###-#### Inspection requested via web by Rena Scott
|
PLM15-02200
| Plumbing Rough-in | 7/17/2015 | 7/17/2015 | 7/17/2015 10:17:25 AM | A | PASS |
|
|
|
PLM15-02398
| Plumbing Rough-in | 7/16/2015 | 7/17/2015 | 7/17/2015 10:12:42 AM | A | NH |
|
|
House will be open anytime after 9 Phone #: ###-#### Inspection requested via web by Troy Paulin-No access, left notice.
|
PLM15-02124
| Groundwork | 7/16/2015 | 7/17/2015 | 7/17/2015 9:47:36 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Brian Johansen-Trunkline ok to cover
|
PLM15-02392
| Other | 7/16/2015 | 7/17/2015 | 7/17/2015 9:46:52 AM | A | DONE |
|
|
Bill// please call before- this inspection is for a conference for the homeowner Phone #: ###-####-Conferance on install
|
PLM15-01670
| Final | 7/16/2015 | 7/17/2015 | 7/17/2015 9:24:13 AM | A | PASS |
|
|
Call for garage code. Phone #: ###-#### Inspection requested via web by David Stephenson
|
PLM15-02389
| Groundwork | 7/16/2015 | 7/17/2015 | 7/17/2015 9:00:43 AM | A | PASS |
|
|
|
PLM15-02200
| Plumbing Rough-in | 7/16/2015 | 7/17/2015 | 7/17/2015 8:01:00 AM | A | PASS |
|
|
General contractor told me they now have approved prints on the job. Phone #: ###-#### Inspection requested via web by Louis Real
|
MEC13-01305
| Mec-Aging Inspection | 7/17/2015 | 7/17/2015 | 7/17/2015 6:11:49 AM | | FAIL |
|
|
no calls
|
PLM15-00631
| PLM-Aging Inspection | 7/17/2015 | 7/17/2015 | 7/17/2015 6:10:37 AM | | PASS |
|
|
|
PLM15-00631
| DOC - Permit Finaled | 7/17/2015 | 7/17/2015 | 7/17/2015 6:10:16 AM | A | PASS |
|
|
|
PLM15-02395
| Final | 7/16/2015 | 7/17/2015 | 7/16/2015 3:14:55 PM | P | CANC |
|
|
Final inspection on a hot water heater install. Phone #: ###-#### >> Inspection requested via web by Nick Drake Inspection cancelled from web by: Nick Drake
|
PLM15-02392
| Other | 7/16/2015 | 7/17/2015 | 7/16/2015 2:56:29 PM | A | CANC |
|
|
8:00 AM
|