GCM15-00164
| GCM-Final | 7/17/2015 | 7/17/2015 | 7/20/2015 10:29:32 AM | P | NH |
|
|
Brett ###-#### - requests call ahead
|
GCM15-00166
| GCM-Final | 7/17/2015 | 7/17/2015 | 7/17/2015 4:33:30 PM | P | FAIL |
|
|
Misty ###-####....need a letter from engineer stating the changes to the venting are ok...needs to be stamped and signed..need venting specs for unit heater as it was moved..need to vent bath exhaust outside
|
GCM15-00166
| GCM-Pressure Test | 7/17/2015 | 7/17/2015 | 7/17/2015 4:29:32 PM | P | PASS |
|
|
Misty ###-####..20lb gas ok to existing unit heater that was moved to make room for the new spray booth
|
GCM15-00165
| GCM-Final | 7/16/2015 | 7/17/2015 | 7/17/2015 4:22:23 PM | P | PASS |
|
|
Robbie ###-####
|
MEC15-03371
| Final | 7/17/2015 | 7/17/2015 | 7/17/2015 3:34:56 PM | P | PASS |
|
|
gas for a bbq.. 20lb u/g ok
|
MEC15-03093
| Final | 7/14/2015 | 7/17/2015 | 7/17/2015 3:29:07 PM | P | PASS |
|
|
Please call Bob 30 mins prior ###-#### Phone #: ###-#### >> Inspection requested via web by James Staley
|
MEC15-03341
| Final | 7/16/2015 | 7/17/2015 | 7/17/2015 2:40:21 PM | P | PASS |
|
|
Installer Jason ###-#### Phone #: ###-#### >> Inspection requested via web by Dustin Rich
|
MEC15-03368
| Final | 7/17/2015 | 7/17/2015 | 7/17/2015 2:24:38 PM | P | PASS |
|
|
Please be in the afternoon with a call to Travis ###-####. Thanks Phone #: ###-#### >> Inspection requested via web by Allie Courter
|
MIS15-00179
| MEC-Final | 7/16/2015 | 7/17/2015 | 7/17/2015 12:14:28 PM | A | PASS |
|
|
Rusty Phone #: ###-####...no work done...all existing
|
MEC15-02420
| Final | 7/16/2015 | 7/17/2015 | 7/17/2015 10:30:24 AM | A | PASS |
|
|
Please have inspector call home owner Tom when in route to his home. ###-#### Phone #: ###-#### >> Inspection requested via web by Carolyn Rudd
|
GCM15-00151
| GCM-Final | 7/13/2015 | 7/17/2015 | 7/17/2015 10:10:30 AM | A | PASS |
|
|
(Resident) Dave ###-#### - requested call ahead
|