ELE13-02106
| ELE-Aging Inspection | 7/17/2018 | 7/17/2018 | 7/18/2018 7:02:39 AM | | PASS |
|
|
Ok final. Service was ok'd for rec in 2013.
|
ELE18-01250
| Final | 7/17/2018 | 7/17/2018 | 7/17/2018 1:57:11 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jake Cutler Ok final.
|
ELE18-02110
| Electrical Rough-In | 7/17/2018 | 7/17/2018 | 7/17/2018 12:56:55 PM | P | PASS |
|
|
I just need an inspection on the grounding only.- Phone #: ###-#### Inspection requested via web by Kendra Lanham Ok cover 3/0 cu electrode cond at back of building. Electrode cond will be covered by min 4 in concrete
|
ELE18-01575
| Electrical Rough-In | 7/17/2018 | 7/17/2018 | 7/17/2018 12:43:42 PM | P | PASS |
|
|
Game room wall inspection. Phone #: ###-#### Inspection requested via web by Garrett Collins Ok cover 1 wall with 2 outlets.
|
ELE18-02681
| Temporary Service | 7/17/2018 | 7/17/2018 | 7/17/2018 12:14:02 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jason Wicks t/s o/h n ok
|
ELE18-02668
| Conference | 7/16/2018 | 7/17/2018 | 7/17/2018 11:34:38 AM | A | DONE |
|
|
Call 25 mins ahead- Brian Phone #: ###-#### Discussed moving 3 in rigid sweep connected to pvc further W in trench to get closer to building.
|
ELE18-02545
| Final | 7/16/2018 | 7/17/2018 | 7/17/2018 10:19:56 AM | A | PASS |
|
|
Please call Tony the owner at ###-#### when in route and she will meet you there. Phone #: ###-#### Inspection requested via web by Craig Korell Ok final. Panels labeled.
|
ELE18-02648
| Electrical Rough-In | 7/16/2018 | 7/17/2018 | 7/17/2018 9:55:01 AM | A | PASS |
|
|
Need an ok to cover walls. Call Jimmy for questions at ###-#### Phone #: ###-#### Inspection requested via web by John Edwards Ok cover kitchen.
|
ELE18-01477
| Electrical Rough-In | 7/16/2018 | 7/17/2018 | 7/17/2018 9:11:03 AM | A | PASS |
|
|
Underground exterior Phone #: ###-#### Inspection requested via web by kendall bender Ok cover exterior grd work for main power and drive thru.
|
ELE18-02676
| Electrical Rough-In | 7/17/2018 | 7/17/2018 | 7/17/2018 8:36:11 AM | A | PASS |
|
|
Ceiling rough-in inspection for bathroom area. New light fixtures will be remodel style cut ins. Call Jarod at ###-#### with any questions Phone #: ###-#### Inspection requested via web by Kevin Perez Ok cover main level bath. Most everything is going to be fished in.
|
ELE18-02134
| Conference | 7/11/2018 | 7/17/2018 | 7/16/2018 7:49:18 AM | A | CANC |
|
|
Final on one apartment and conference on service change. Phone #: ###-#### >> Inspection requested via web by Jake Cutler Inspection cancelled from web by: Jake Cutler
|