ELE18-01381
| Final | 7/17/2018 | 7/17/2018 | 7/17/2018 3:57:50 PM | P | CANC |
|
|
rescheduled to next day
|
ELE18-00397
| Permanent Service | 7/17/2018 | 7/17/2018 | 7/17/2018 3:06:24 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Tom Jenkins...p/s u/g new ok
|
ELE18-02531
| Electrical Rough-In | 7/17/2018 | 7/17/2018 | 7/17/2018 2:34:01 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ryan Wake...rough ok to cover..service grounding brought up to code and using existing panel...pushmatic panel previously oked by Daryl Degrange...back seperate building has seperate address 6616 and has nothing do to with this project
|
ELE18-02563
| Electrical Rough-In | 7/17/2018 | 7/17/2018 | 7/17/2018 2:02:41 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Burke...ok to cover rough in minus back patio and fireplace...rough in inspection needs scheduled once built and installed
|
ELE18-02686
| Electrical Rough-In | 7/17/2018 | 7/17/2018 | 7/17/2018 1:19:13 PM | P | PASS |
|
|
New covered back patio Phone #: ###-#### Inspection requested via web by danny perrine...ok to cover...outlets and exterior lighting cut in once sided
|
ELE18-00083
| Final | 7/17/2018 | 7/17/2018 | 7/17/2018 1:03:18 PM | P | PASS |
|
|
inspection scheduled to final out permit...contractor was responsible for rough in only...trim out and connection to panels done by other electrical contractor and takes responsibility for work
|
ELE18-01381
| Final | 7/16/2018 | 7/17/2018 | 7/17/2018 1:00:41 PM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Troy Cobb...rescheduled to PM so can repair some violations
|
ELE18-02138
| Final | 7/16/2018 | 7/17/2018 | 7/17/2018 11:14:16 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by BRS Permitting...no access...under age child only one home...adult or representative shall be present for inspection
|
ELE18-02364
| Electrical Rough-In | 7/15/2018 | 7/17/2018 | 7/17/2018 10:46:33 AM | A | PASS |
|
|
Please call 15 minutes before arrival. Thanks. Phone #: ###-#### Inspection requested via web by Robert Pietras...rated fan boxes and remodel cans be used...boxes cut in for switching...ok to cover patio ceiling
|
ELE18-00069
| Electrical Rough-In | 7/16/2018 | 7/17/2018 | 7/17/2018 10:28:20 AM | A | CANC |
|
|
Bill Phone #: ###-####...converted to conference
|
ELE18-00069
| Conference | 7/17/2018 | 7/17/2018 | 7/17/2018 10:27:57 AM | A | PASS |
|
|
Bill Phone #: ###-####...discussed stapling of wires, box fill/sizing, makeup of wires, bathroom outlet circuit requirement, ARC fault protection, and junction box access and blanking
|
ELE18-00849
| Conference | 7/17/2018 | 7/17/2018 | 7/17/2018 9:35:29 AM | A | PASS |
|
|
plenum wall discussion...met with plumbing, hvac, general of job, and electrical foreman and discussed wiring of walls being used as plenum....confusion on prints how walls being used...return or supply of air in manufactureing plant area
|
ELE17-02649
| Final | 7/16/2018 | 7/17/2018 | 7/17/2018 8:53:45 AM | A | PART |
|
|
This is a partial final - for roof. Contact is Andy Chambers. Phone #: ###-#### Inspection requested via web by Scott Campbell...roof top units ok
|