ELE17-00899
| ELE-Aging Inspection | 7/17/2019 | 7/17/2019 | 7/17/2019 3:08:14 PM | | PASS |
|
|
Doc final, job cancelled
|
ELE17-00899
| DOC - Permit Expired | 7/17/2019 | 7/17/2019 | 7/17/2019 3:07:30 PM | P | PASS |
|
|
Doc final ok Job cancelled
|
ELE19-00601
| Electrical Rough-In | 7/17/2019 | 7/17/2019 | 7/17/2019 3:04:29 PM | P | PASS |
|
|
Concrete cover on PT deck. Danny is the contact Phone #: ###-#### Inspection requested via web by Buster Bowen Level 2 PT deck pour rough in ok cover
|
ELE19-01730
| Final | 7/17/2019 | 7/17/2019 | 7/17/2019 1:28:52 PM | P | PASS |
|
|
Contact Alex Ybarra Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Final ok
|
ELE19-01282
| Final | 7/16/2019 | 7/17/2019 | 7/17/2019 12:48:26 PM | A | PASS |
|
|
Hello, this is for the First Interstate Banks 4 new illuminated wall signs. Please contact the manager for access to electrical room and permits. Please call Mark Myers if have any concerns at ###-####. Thank you, Ardis @ Carlson Sign Co. Phone #: ###-#### Inspection requested via web by Ardis Cox Final ok
|
ELE19-01282
| Electrical Rough-In | 7/17/2019 | 7/17/2019 | 7/17/2019 12:48:04 PM | P | PASS |
|
|
Listing and disconnecting means confirmed. Rough in ok cover
|
ELE19-01093
| Final | 7/16/2019 | 7/17/2019 | 7/17/2019 12:17:03 PM | A | PASS |
|
|
Hello! This is for the new wall signs at the new First Interstate Bank. Please contact the manager to give you access to the electrical room. If you have any questions or concerns please call Mark Myers at ###-####. Thank you, Ardis @ Carlson Sign Co. Phone #: ###-#### Inspection requested via web by Ardis Cox Final ok
|
ELE19-01093
| Electrical Rough-In | 7/17/2019 | 7/17/2019 | 7/17/2019 12:16:36 PM | P | PASS |
|
|
Hello! This is for the new wall signs at the new First Interstate Bank. Please contact the manager to give you access to the electrical room. If you have any questions or concerns please call Mark Myers at ###-####. Thank you, Ardis @ Carlson Sign Co. Phone #: ###-#### Inspection requested via web by Ardis Cox Listing and disconnecting means confirmed. Rough in ok
|
ELE19-02523
| Rough-In Permanent Service | 7/16/2019 | 7/17/2019 | 7/17/2019 11:18:12 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot 110.14(D)- Grounding electrode termination in meter panel combo shall be torqued to spec. Termination in panel loose. 210.52(C)- Area to right of range is new counter top space in kitchen and shall have receptacle outlets installed. 250.110- Short runs of flexible metal conduit shall be bonded to equiment grounding conductor or terminate to a box with equipment grounding conductor terminated within. Floor heat boxes. 300.4- Where NM cable is run thru holes or channels that do not maintain 1 1/4" from framing surface they shall be protected from physical damage by nail plates or raceways. 408.7- Unused breaker spaces shall be closed by approved means prior to being energized.
|
ELE19-02403
| Electrical Rough-In | 7/17/2019 | 7/17/2019 | 7/17/2019 9:34:28 AM | A | PASS |
|
|
For access please all Troy 1/2 hr prior to inspection. ###-#### Phone #: ###-#### Inspection requested via web by Terry Scott Stage floor receptacles shall be seperate due to listing of low volt not listed for line voltage. Sound booth and stage floor and walls rough in ok cover
|
ELE19-01730
| Final | 7/16/2019 | 7/17/2019 | 7/17/2019 7:21:43 AM | A | CANC |
|
|
Contact Alex Ybarra Thank you Phone #: ###-#### >> Inspection requested via web by Cathy Duchek Inspection cancelled from web by: Cathy Duchek
|
ELE19-01018
| Electrical Rough-In | 7/16/2019 | 7/17/2019 | 7/16/2019 1:24:30 PM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack East underground for 6 lights rough in ok cover
|