Inspections for the day of: Wednesday, July 17, 2019.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-01276 Electrical Rough-In7/16/20197/17/20197/17/2019 1:33:18 PMPPASS
hard ceilings Phone #: ###-#### Inspection requested via web by Lee VanSchoiack
Areas with hard lids ok to cover
ELE19-01942 Final7/16/20197/17/20197/17/2019 1:32:24 PMPPASS
Kitchen Final Phone #: ###-#### Inspection requested via web by Scott BARKER
Final ok
ELE19-01623 Final7/17/20197/17/20197/17/2019 12:53:00 PMPFAIL
code to get in 6363 Phone #: ###-#### Inspection requested via web by Chris Berthelot
210.12 All bedrooms shall have AFCI protection not GFCI
110.25 Lockable means of Disc for hard wired appliances(hood,dishwasher)
ELE19-02637 Conference7/16/20197/17/20197/17/2019 11:26:49 AMADONE
Please call me half hour before so I can get electrician to meet you there.
Thank You Dawn ###-#### Phone #: ###-#### Inspection requested via web by Kendra Lanham
Discuss burned service lugs, will either replace with like for like to avoid complete change out, also talked about adding a gutter under existing meter pack to tap to another meter main to refeed unit and all grounding at this point will be brought up to current code as required....
ELE19-02586 Electrical Rough-In7/16/20197/17/20197/17/2019 11:02:50 AMAPASS
House is vacant. Key box at garage side man door. Code is 7828.
Main floor complete remodel with exception of garage, pool and and storage behind garage. Basement not touched except to add 2 smoke detectors. Phone #: ###-#### Inspection requested via web by David McClellan
First floor re-wire ok to cover
ELE19-00961 Final7/16/20197/17/20197/17/2019 9:54:32 AMACANC
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack
No one home, will need to re-schedule when somone can be on site.
ELE19-02632 Electrical Rough-In7/16/20197/17/20197/17/2019 9:45:26 AMAPASS
Please call 15 min prior to site visit. Phone #: ###-#### Inspection requested via web by Mike Leonard
Verified addition of 3 panels to existing solar system. will clone a final
ELE19-02632 Final7/17/20197/17/20197/17/2019 9:45:14 AMPPASS
Please call 15 min prior to site visit. Phone #: ###-#### Inspection requested via web by Mike Leonard
Final ok
ELE19-02605 Final7/16/20197/17/20197/17/2019 9:29:20 AMPPASS
Final Inspection in conjunction with AltEnergy Final Inspection Phone #: ###-#### Inspection requested via web by JENNY EMEL
Final ok
ELE19-02525 Final7/16/20197/17/20197/17/2019 9:28:47 AMPPASS
Please contact Micah Hornback at ###-#### to meet on site for inspection.
Thank you! Phone #: ###-#### Inspection requested via web by Jesse Simpson
Final ok
ELE19-02525 Electrical Rough-In7/16/20197/17/20197/17/2019 9:27:24 AMAPASS
Please contact Micah Hornback at ###-#### to meet on site for inspection.
Thank you! Phone #: ###-#### Inspection requested via web by Jesse Simpson
Verified U/L listing and scope of work for Solar Array install