ELE19-01276
| Electrical Rough-In | 7/16/2019 | 7/17/2019 | 7/17/2019 1:33:18 PM | P | PASS |
|
|
hard ceilings Phone #: ###-#### Inspection requested via web by Lee VanSchoiack Areas with hard lids ok to cover
|
ELE19-01942
| Final | 7/16/2019 | 7/17/2019 | 7/17/2019 1:32:24 PM | P | PASS |
|
|
Kitchen Final Phone #: ###-#### Inspection requested via web by Scott BARKER Final ok
|
ELE19-01623
| Final | 7/17/2019 | 7/17/2019 | 7/17/2019 12:53:00 PM | P | FAIL |
|
|
code to get in 6363 Phone #: ###-#### Inspection requested via web by Chris Berthelot 210.12 All bedrooms shall have AFCI protection not GFCI 110.25 Lockable means of Disc for hard wired appliances(hood,dishwasher)
|
ELE19-02637
| Conference | 7/16/2019 | 7/17/2019 | 7/17/2019 11:26:49 AM | A | DONE |
|
|
Please call me half hour before so I can get electrician to meet you there. Thank You Dawn ###-#### Phone #: ###-#### Inspection requested via web by Kendra Lanham Discuss burned service lugs, will either replace with like for like to avoid complete change out, also talked about adding a gutter under existing meter pack to tap to another meter main to refeed unit and all grounding at this point will be brought up to current code as required....
|
ELE19-02586
| Electrical Rough-In | 7/16/2019 | 7/17/2019 | 7/17/2019 11:02:50 AM | A | PASS |
|
|
House is vacant. Key box at garage side man door. Code is 7828. Main floor complete remodel with exception of garage, pool and and storage behind garage. Basement not touched except to add 2 smoke detectors. Phone #: ###-#### Inspection requested via web by David McClellan First floor re-wire ok to cover
|
ELE19-00961
| Final | 7/16/2019 | 7/17/2019 | 7/17/2019 9:54:32 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by Lee VanSchoiack No one home, will need to re-schedule when somone can be on site.
|
ELE19-02632
| Electrical Rough-In | 7/16/2019 | 7/17/2019 | 7/17/2019 9:45:26 AM | A | PASS |
|
|
Please call 15 min prior to site visit. Phone #: ###-#### Inspection requested via web by Mike Leonard Verified addition of 3 panels to existing solar system. will clone a final
|
ELE19-02632
| Final | 7/17/2019 | 7/17/2019 | 7/17/2019 9:45:14 AM | P | PASS |
|
|
Please call 15 min prior to site visit. Phone #: ###-#### Inspection requested via web by Mike Leonard Final ok
|
ELE19-02605
| Final | 7/16/2019 | 7/17/2019 | 7/17/2019 9:29:20 AM | P | PASS |
|
|
Final Inspection in conjunction with AltEnergy Final Inspection Phone #: ###-#### Inspection requested via web by JENNY EMEL Final ok
|
ELE19-02525
| Final | 7/16/2019 | 7/17/2019 | 7/17/2019 9:28:47 AM | P | PASS |
|
|
Please contact Micah Hornback at ###-#### to meet on site for inspection. Thank you! Phone #: ###-#### Inspection requested via web by Jesse Simpson Final ok
|
ELE19-02525
| Electrical Rough-In | 7/16/2019 | 7/17/2019 | 7/17/2019 9:27:24 AM | A | PASS |
|
|
Please contact Micah Hornback at ###-#### to meet on site for inspection. Thank you! Phone #: ###-#### Inspection requested via web by Jesse Simpson Verified U/L listing and scope of work for Solar Array install
|