MEC95-00172
| INSP - Gas log/ Fireplace | 7/19/1995 | 7/18/1995 | 7/19/1995 12:00:00 AM | A | PASS |
|
|
f/p was approved left note about mantel. 15 min
|
MEC95-00239
| INSP - Gas pressure test | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | | PASS |
|
|
#26161
|
MEC95-00239
| INSP - Framing/ Rough-in | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | | PASS |
|
|
20 MIN
|
MEC95-00240
| INSP - Gas pressure test | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | | PASS |
|
|
#26158
|
MEC95-00240
| INSP - Framing/ Rough-in | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | | PASS |
|
|
20 MIN
|
MEC95-00234
| INSP - Final | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | A | |
|
|
|
MEC3047660
| INSP - Conference | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | A | PASS |
|
|
meet with john from boise heating to go over requirement so furnace would pass code. selve vent pipe and install a partition between furn and closet. 20 min.
|
MEC95-00095
| INSP - Final | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | A | FAIL |
|
|
upper comb-air is covered with plastic needs to be removed. 25 minutes
|
MEC95-00120
| INSP - Final | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | A | PASS |
|
|
left note piece of duct wrap had come loose from duct. 25 minutes
|
MEC95-00225
| INSP - Gas pressure test | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | A | FAIL |
|
|
pressure was on zero. 10 minutes
|
MEC95-00225
| INSP - Framing/ Rough-in | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | A | FAIL |
|
|
need to draft stop b-vent at 2nd floor and attic penatrations. electrical wire is stretched tight across b-vent on 2nd floor in wall. need to permit f/p as of07-18-95. 20 min.
|
MEC95-00226
| INSP - Gas log/ Fireplace | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | P | PASS |
|
|
2 f/ps both ok. 20 min
|
MEC95-00227
| INSP - Gas log/ Fireplace | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | P | FAIL |
|
|
used metal flex, have to remove and use class 1 duct on their f/a. 15 min
|
MEC95-00228
| INSP - Gas log/ Fireplace | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | P | PASS |
|
|
f/p ok 15 min
|
MEC95-00230
| INSP - Gas log/ Fireplace | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | P | PASS |
|
|
f/p ok 15 min
|
MEC95-00145
| INSP - Gas pressure test | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | P | PASS |
|
|
gas pipe ok 26163 15 min
|
MEC95-00145
| INSP - Framing/ Rough-in | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | P | FAIL |
|
|
combination w/h-furn. not ready check am 07-19-95. 15 minutes
|
MEC3047660
| INSP - Final | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | P | PASS |
|
|
corrections were made. furnace was seperated from the closet space with a divider, and the comb. air was moved in the floor, and the vent in closet space was selved. 15 min
|
MEC95-00222
| INSP - Final | 7/18/1995 | 7/18/1995 | 7/18/1995 12:00:00 AM | P | PASS |
|
|
combustion air grills to w/h-furn room were added so w/h-furn are approved. 20 min
|