ELE97-01643
| INSP - Final | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | | PASS |
|
|
07/18/97 315 - 14 ok jf
|
ELE97-02273
| INSP - Electrical Rough-In | 7/17/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | A | PASS |
|
|
09 ok jf interior walls
|
ELE97-02375
| INSP - Ele Rough-In/Perm Svc | 7/17/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | A | PASS |
|
|
07/17/97 315 - 09&53 ok jf 14rms 1a/c 200a u/g new
|
ELE97-02376
| INSP - T/S and Final | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | P | FAIL |
|
|
07/18/97 315 - 49 failed jf cor. posted, NEC, 110-3(b)&12, 310-12(b), 20 70, 71, 72
|
ELE97-02331
| INSP - Ele Rough-In/Perm Svc | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | P | PASS |
|
|
07/18/97 315 - 09&53 ok jf 9rms 1a/c 200a
|
ELE97-02332
| INSP - Ele Rough-In/Perm Svc | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | P | PASS |
|
|
07/18/97 315 - 09&53 ok jf 10rms 1a/c 200a u/g new
|
ELE97-02227
| INSP - Conference | 7/17/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | P | PASS |
|
|
07/18/97 315 - 1 o'clock at lee desk 01 ok jf attended meeting with Micr emergency power to permanent power
|