BLD1053875
| INSP - Framing/Rough-in | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | | PART |
|
|
/ / 340 - REINSP NEED EX DUCTS CONNECTED
|
BLD1053875
| INSP - Framing/Rough-in | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | | PART |
|
|
/ / 340 - REINSP NEED EX DUCTS CONNECTED
|
BLD97-00044
| INSP - Masonry | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | | PART |
|
|
/ / 340 - CHILLER, BLDG 6; SPEC INSP REPORT PENDING..SENT TO SLY IN ER
|
BLD97-01809
| INSP - Energy code compliance | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | | PART |
|
|
/ / 340 - need floor ins
|
BLD97-01809
| INSP - Energy code compliance | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | | PART |
|
|
/ / 340 - need floor ins
|
BLD97-00044
| INSP - Carpentry | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | P | PART |
|
|
07/18/97 340 - STRUCT AND 2HR WALL, HP BLDG 6, INK JET FAB AREA; AWAITIN CABLE TRAYS, ETC. ALSO SPEC INSP REPORTS FOR SPRAY ON.
|
BLD97-00401
| INSP - Temporary occupancy | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | P | NR |
|
|
07/18/97 340 - BLDG 6, keep c/n, Dan S reviewing resub at bsmt hpm corr
|
BLD97-00494
| INSP - Masonry | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | P | PART |
|
|
07/18/97 340 - SENT TO SLY IN ERROR, ADDED BY 340 ..SPEC INSP REPORT PEN
|
BLD97-01439
| INSP - Conference | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | P | PASS |
|
|
07/18/97 340 - RE DOUBLE 1HR TOWNHOSE WALLS;LOOKS OK ABOVE PLATES AT GAR DTO COMPLETE
|
BLD97-01571
| INSP - Conference | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | P | FAIL |
|
|
07/18/97 340 - C/N, NEED FINALS; PLAN ONSITE ETC.
|
BLD97-01809
| INSP - Framing/Rough-in | 7/18/1997 | 7/18/1997 | 7/18/1997 12:00:00 AM | P | PASS |
|
|
07/18/97 340 - ok
|