BLD00-02013
| BLD-Concrete | 7/17/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | A | PASS |
|
|
JAMES-- ###-#### STEM WALL INSP
|
BLD00-02010
| BLD-Concrete | 7/17/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | A | PASS |
|
|
JAMES ###-#### STEM WALL
|
BLD00-01307
| BLD-Framing/Rough-in | 7/17/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | A | FAIL |
|
|
kyle ###-#### Please go out early this was missed and put in my amanda for the am which should of been put in for the pm since it was schedule for that day.Sorry MECcheck fail 7/18/00 11:57:12 AM
|
BLD00-00233
| BLD-Final | 7/17/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | A | PASS |
|
|
ZAL ###-####-FN- CALL 1ST BEFORE INSP--FOR ACCESS TO GAR- KEY PAD----2042ENTER --
|
BLD00-01665
| BLD-Conference | 7/17/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/17/2000 at 18:04:23. Contact: ###-####. C/N Discuss HD's 7/18/00 12:00:50 PM
|
BLD00-01465
| BLD-Framing/Rough-in | 7/17/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | A | PASS |
|
|
elliott ###-#### Req. underfloor insul...check @ final. 7/18/00 12:00:09 PM
|
BLD00-01239
| BLD-Framing/Rough-in | 7/17/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/17/2000 at 13:55:22. Contact: . Need Eng. paperwork 7/18/00 11:56:27 AM
|
BLD00-01265
| BLD-Framing/Rough-in | 7/17/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | P | FAIL |
|
|
for lorin--###-####--re-insp --shear wall C/N..Need letter form Eng to OK 16" shear panels at Gar fronts. 7/18/00 1:31:35 PM
|
BLD00-01307
| BLD-Energy code compliance | 7/17/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | P | PASS |
|
|
Kyle ###-#### Undrfloor insul Req @ final (unless Watts OK /R-13 wall. 7/18/00 2:04:58 PM
|
BLD00-01449
| BLD-Framing/Rough-in | 7/18/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/18/2000 at 07:07:28. Contact: ###-####. Need Energy report 7/18/00 4:19:59 PM
|
BLD00-01615
| BLD-Framing/Rough-in | 7/18/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | P | FAIL |
|
|
shear brad ###-####
|
BLD00-02012
| BLD-Footing | 7/18/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | P | PART |
|
|
jerry ###-####
|
BLD00-00867
| BLD-Footing | 7/18/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | P | PART |
|
|
eric ###-####
|
BLD00-01247
| BLD-Framing/Rough-in | 7/18/2000 | 7/18/2000 | 7/18/2000 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/18/2000 at 10:08:29. Contact: ###-####. Need truss Eng and appr plans 7/18/00 1:59:16 PM
|