MEC02-01906
| Final | 7/17/2002 | 7/18/2002 | 7/18/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 10:29:34. Contact: ###-####.
|
BLD01-02069
| BLD-Conference | 7/17/2002 | 7/18/2002 | 7/18/2002 12:00:00 AM | A | PASS |
|
|
extension needed not ready for inspection yet ###-#### amber one time extention ok 7/18/2002 8:53:50 AM
|
BLD01-02848
| BLD-Final | 7/17/2002 | 7/18/2002 | 7/18/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 13:40:45. Contact: ###-####.doors and fire stopping/ chem room wall repair, 7/18/2002 12:29:02 PM
|
BLD02-01617
| BLD-Footing | 7/17/2002 | 7/18/2002 | 7/18/2002 12:00:00 AM | A | NR |
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 14:00:59. Contact: ###-####.
|
MIS02-00171
| BLD-Final | 7/17/2002 | 7/18/2002 | 7/18/2002 12:00:00 AM | P | FAIL |
|
|
MIKE ###-#### p/l roof at 0" w/o protection/ 4x4 posts @12 ft to small for colum design.need ceilling or 10 ft ladreal bracing overbulid roof overspan 2x4 support. 7/18/2002 2:31:51 PM
|
BLD02-01498
| BLD-Footing | 7/17/2002 | 7/18/2002 | 7/18/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/17/2002 at 22:36:32. Contact: ###-####. ft ok 7/18/2002 1:51:21 PM
|
BLD02-01617
| BLD-Footing | 7/18/2002 | 7/18/2002 | 7/18/2002 12:00:00 AM | P | PASS |
|
|
lazaro; Phone #: ###-#### north mew ft. only ok. 7/18/2002 1:33:38 PM
|
BLD01-01733
| BLD-Conference | 7/18/2002 | 7/18/2002 | 7/18/2002 12:00:00 AM | P | PASS |
|
|
###-#### ANDY NEEDS PERMIT EXTENSION wip 7/18/2002 4:17:50 PM
|
BLD02-01388
| BLD-Footing | 7/17/2002 | 7/18/2002 | 7/18/2002 12:00:00 AM | P | CANC |
|
|
DELL; Phone #: ###-#### DELL CALLED IN TO CANC THIS INSPECTION 7-18-02
|