Inspections for the day of: Thursday, July 18, 2002.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00261 INSP-Sprinkler Rough-in/Hydro7/17/20027/18/20027/18/2002 12:00:00 AMAPART
rick; Phone #: ###-#### okay to cover; need calc's due to use of flexhead type sprinklers and they weren't shown on plans 7/18/2002 9:38:28 AM
BLD02-00131 FIRE-Final Inspection7/17/20027/18/20027/18/2002 12:00:00 AMAPASS
FIRE FN DUTCH- ###-####
FIR02-00209 INSP-Supply line flush7/17/20027/18/20027/18/2002 12:00:00 AMAPART
rick; Phone #: ###-#### see FIR02-00167 7/18/2002 10:52:28 AM
FIR02-00167 INSP-Supply line flush7/18/20027/18/20027/18/2002 12:00:00 AMAPASS
Added by Inspector: 409 On 7/18/2002 10:52:05 AM
FIR02-00063 INSP-Conference7/18/20027/18/20027/18/2002 12:00:00 AMPPART
Added by Inspector: 409 On 7/18/2002 3:20:17 PM met with Larry Cardinale and Bryan Johnson (via tele conference) about sprinklering the west vestibules; east area above ceiling where combustibles are exposed and the curtain track with combustile wood exposed around the perimeter; told Larry to get approval from Dave Miller about the perimeter combustibles and not adding sprinklers
FIR02-00020 INSP-Final Inspection7/17/20027/18/20027/18/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 07/17/2002 at 16:37:31. Contact: ###-####. batteries not supervised; need fire extinguisher 7/18/2002 3:15:37 PM