MEC03-01890
| Final | 7/17/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | A | PASS |
|
|
###-#### hugo
|
MEC03-01890
| Pressure Test | 7/17/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | A | DONE |
|
|
###-#### hugo
|
MEC03-01889
| Final | 7/17/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | A | PASS |
|
|
###-#### hugo
|
MEC03-01889
| Pressure Test | 7/17/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | A | DONE |
|
|
###-#### hugo tested at mec r/i 7/18/2003 9:23:01 AM
|
MEC03-01891
| Final | 7/17/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | A | PASS |
|
|
###-#### hugo
|
MEC03-01891
| Pressure Test | 7/17/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | A | DONE |
|
|
###-#### hugo
|
BLD03-01118
| BLD-Framing/Rough-in | 7/17/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | A | NR |
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore talked about stairs and ramps 7/18/2003 12:18:47 PM
|
MEC03-01894
| Rough-in | 7/17/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | A | PASS |
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
MEC03-01860
| Rough-in | 7/17/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | A | PASS |
|
|
|
MEC03-00873
| Final | 7/17/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | A | PASS |
|
|
|
MEC03-01848
| Final | 7/17/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | A | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: Sherri Petterson vent pipe note sloped at 1/4 per ft also to many ellbows for length of 2'' pipe 7/18/2003 11:11:40 AM
|
MEC03-01866
| Pressure Test | 7/17/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 1:55:05 PM. Contact: ###-####.
|
MEC03-01314
| Conference | 7/18/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | A | DONE |
|
|
|
MEC03-01354
| Final | 7/18/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | P | NR |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
BLD02-02563
| BLD-Final | 7/18/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | P | CANC |
|
|
will ###-####--cancel per will
|
MEC03-01334
| Final | 7/18/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 7/18/2003 at 10:56:01 AM. Contact: ###-####.
|
BLD02-03057
| BLD-Framing/Rough-in | 7/18/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | P | PART |
|
|
shear ok to cover ext
|
BLD03-01072
| BLD-Framing/Rough-in | 7/17/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 7/17/2003 at 3:04:02 PM. Contact: ###-####. c/n on site ok to insulat 7/18/2003 1:44:14 PM e 7/18/2003 1:45:21 PM
|
BLD03-01433
| BLD-Framing/Rough-in | 7/18/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/18/2003 at 7:46:21 AM. Contact: ###-####. ok to cover ext shear ok also ok to insulate 7/18/2003 2:57:18 PM
|
BLD03-01360
| BLD-Footing | 7/18/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 7/18/2003 at 7:58:26 AM. Contact: ###-####.
|
BLD03-01428
| BLD-Framing/Rough-in | 7/18/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | P | PART |
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie int walls ok to cover need to check top of wall bracing at cieling grid inspection also check and make sure grid is not attached to walls 7/18/2003 4:02:09 PM
|
MEC03-01872
| Rough-in | 7/18/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Lena Sloan
|
BLD02-03057
| BLD-Concrete | 7/18/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | P | PART |
|
|
chris shear panel; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
MEC03-01863
| Rough-in | 7/18/2003 | 7/18/2003 | 7/18/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 7/18/2003 at 9:24:09 AM. Contact: ###-####. ducts only still needs to install grillls and flex units installed with shell and core 7/18/2003 3:59:58 PM
|