Inspections for the day of: Friday, July 18, 2003.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC03-01890 Final7/17/20037/18/20037/18/2003 12:00:00 AMAPASS
###-#### hugo
MEC03-01890 Pressure Test7/17/20037/18/20037/18/2003 12:00:00 AMADONE
###-#### hugo
MEC03-01889 Final7/17/20037/18/20037/18/2003 12:00:00 AMAPASS
###-#### hugo
MEC03-01889 Pressure Test7/17/20037/18/20037/18/2003 12:00:00 AMADONE
###-#### hugo tested at mec r/i 7/18/2003 9:23:01 AM
MEC03-01891 Final7/17/20037/18/20037/18/2003 12:00:00 AMAPASS
###-#### hugo
MEC03-01891 Pressure Test7/17/20037/18/20037/18/2003 12:00:00 AMADONE
###-#### hugo
BLD03-01118 BLD-Framing/Rough-in7/17/20037/18/20037/18/2003 12:00:00 AMANR
tim; Phone #: ###-#### Internet Inspection Request from: Barbara Moore talked about stairs and ramps 7/18/2003 12:18:47 PM
MEC03-01894 Rough-in7/17/20037/18/20037/18/2003 12:00:00 AMAPASS
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
MEC03-01860 Rough-in7/17/20037/18/20037/18/2003 12:00:00 AMAPASS
MEC03-00873 Final7/17/20037/18/20037/18/2003 12:00:00 AMAPASS
MEC03-01848 Final7/17/20037/18/20037/18/2003 12:00:00 AMAFAIL
Phone #: ###-#### Internet Inspection Request from: Sherri Petterson vent pipe note sloped at 1/4 per ft also to many ellbows for length of 2'' pipe 7/18/2003 11:11:40 AM
MEC03-01866 Pressure Test7/17/20037/18/20037/18/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 7/17/2003 at 1:55:05 PM. Contact: ###-####.
MEC03-01314 Conference7/18/20037/18/20037/18/2003 12:00:00 AMADONE
MEC03-01354 Final7/18/20037/18/20037/18/2003 12:00:00 AMPNR
joe; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
BLD02-02563 BLD-Final7/18/20037/18/20037/18/2003 12:00:00 AMPCANC
will ###-####--cancel per will
MEC03-01334 Final7/18/20037/18/20037/18/2003 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 7/18/2003 at 10:56:01 AM. Contact: ###-####.
BLD02-03057 BLD-Framing/Rough-in7/18/20037/18/20037/18/2003 12:00:00 AMPPART
shear ok to cover ext
BLD03-01072 BLD-Framing/Rough-in7/17/20037/18/20037/18/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 7/17/2003 at 3:04:02 PM. Contact: ###-####. c/n on site ok to insulat 7/18/2003 1:44:14 PM e 7/18/2003 1:45:21 PM
BLD03-01433 BLD-Framing/Rough-in7/18/20037/18/20037/18/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 7/18/2003 at 7:46:21 AM. Contact: ###-####. ok to cover ext shear ok also ok to insulate 7/18/2003 2:57:18 PM
BLD03-01360 BLD-Footing7/18/20037/18/20037/18/2003 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 7/18/2003 at 7:58:26 AM. Contact: ###-####.
BLD03-01428 BLD-Framing/Rough-in7/18/20037/18/20037/18/2003 12:00:00 AMPPART
jim; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie int walls ok to cover need to check top of wall bracing at cieling grid inspection also check and make sure grid is not attached to walls 7/18/2003 4:02:09 PM
MEC03-01872 Rough-in7/18/20037/18/20037/18/2003 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: Lena Sloan
BLD02-03057 BLD-Concrete7/18/20037/18/20037/18/2003 12:00:00 AMPPART
chris shear panel; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
MEC03-01863 Rough-in7/18/20037/18/20037/18/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 7/18/2003 at 9:24:09 AM. Contact: ###-####. ducts only still needs to install grillls and flex units installed with shell and core 7/18/2003 3:59:58 PM