Inspections for the day of: Friday, July 18, 2003.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00867 FIRE-Final Inspection7/16/20037/18/20037/18/2003 12:00:00 AMAPASS
mike; Phone #: ###-#### Fire alarm, fire sprinkler and fire life safety finaled 7/18/2003 8:47:32 AM
FIR03-00349 INSP-Final Inspection7/17/20037/18/20037/18/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 7/17/2003 at 1:25:30 PM. Contact: ###-####.
FIR03-00256 INSP-Final Inspection7/18/20037/18/20037/18/2003 12:00:00 AMAPASS
FIR03-00132 INSP-Final Inspection7/18/20037/18/20037/18/2003 12:00:00 AMAPASS
FIR03-00321 INSP-Alarm Testing7/18/20037/18/20037/18/2003 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 7/18/2003 at 8:07:12 AM. Contact: ###-####.
BLD02-02435 FIRE-Sprinkler Rough-in7/18/20037/18/20037/18/2003 12:00:00 AMPFAIL
This inspection was apparently for life safety. The only items inspected was the emergency lights and exit signs. No other items looked at 7/18/2003 6:10:03 PM
BLD03-00580 FIRE-Final Inspection7/18/20037/18/20037/18/2003 12:00:00 AMPPASS
fire fn ###-####- greg
FIR03-00057 INSP-Final Inspection7/18/20037/18/20037/18/2003 12:00:00 AMPFAIL
elevator recall still does not work due to a bad breaker, provide modified map for the facp 7/18/2003 4:20:43 PM
FIR02-00459 INSP-Final Inspection7/18/20037/18/20037/18/2003 12:00:00 AMPPASS
fire sprinklers finaled 7/18/2003 4:17:58 PM
FIR03-00133 INSP-Sprinkler Rough-in/Hydro7/17/20037/18/20037/18/2003 12:00:00 AMPFAIL
Rough-in inspection performed on the east, west and south wings. North wing still needs to be done. Separation between the east wing and the living area is an issue. Earthquake bracing needs to be moved to the top chord of the trusses or get engineering sign off. Extended coverage sidewalls not installed. 7/18/2003 2:03:02 PM
FIR03-00186 INSP-Final Inspection7/17/20037/18/20037/17/2003 4:46:06 PMPCANC
Scheduled by a contractor via Hello! on 7/17/2003 at 4:05:45 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 17 2003 4:46PM.
FIR03-00186 INSP-Conference7/17/20037/18/20037/17/2003 4:45:34 PMPCANC
Scheduled by a contractor via Hello! on 7/17/2003 at 4:04:53 PM. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on Jul 17 2003 4:45PM.