ELE07-01528
| Final | 7/18/2007 | 7/18/2007 | 7/18/2007 4:01:22 PM | P | PASS |
|
|
final ok
|
ELE07-02530
| Electrical Rough-In | 7/18/2007 | 7/18/2007 | 7/18/2007 3:56:37 PM | P | FAIL |
|
|
electrician is Ron Chaney Phone #: ###-#### Internet Inspection Request from: Jarrod Clymer 1. 230.24A--8ft clearance above the roof 2. 240.24D--Overcurrent devices not in closets 3. 344.30A--Guide wire support shall be within 3ft of mast head 4. 110.3A&B--Listing and Lableing of equipment for use (panels in closets have been scabbed together)
|
ELE07-01722
| Electrical Rough-In | 7/18/2007 | 7/18/2007 | 7/18/2007 3:45:52 PM | P | PART |
|
|
ART GUERRERO - WILL MEET @ JOB SITE Phone #: ###-#### Internet Inspection Request from: Randy Vail per prints ok to cover
|
ELE07-02380
| Electrical Rough-In | 7/18/2007 | 7/18/2007 | 7/18/2007 3:04:17 PM | P | PASS |
|
|
hand rail bonding ###-#### Internet Inspection Request from: Todd Holbrook bonding ok
|
ELE07-01308
| Electrical Rough-In | 7/17/2007 | 7/18/2007 | 7/18/2007 1:25:48 PM | P | PASS |
|
|
Inspection for ceiling cover. Brian is electrician. Phone #: ###-#### x0000 Internet Inspection Request from: Tawnya McKinney 1. as noted on prints ok
|
ELE07-01528
| Rough-In Permanent Service | 7/17/2007 | 7/18/2007 | 7/18/2007 11:52:51 AM | A | PASS |
|
|
Code corrections made and ready for a re-inspection please. Thanks Phone #: ###-#### Internet Inspection Request from: BRIAN KEITH ri ok
|
ELE07-02125
| Rough-In Permanent Service | 7/17/2007 | 7/18/2007 | 7/18/2007 11:00:03 AM | A | PASS |
|
|
2243, 2245, 2247, 2249, 2251 E Warm Springs ave and 1 house meter 2251H - ###-#### p/s ok on last five units, and house panel meter ok also.
|
ELE07-01691
| Electrical Rough-In | 7/17/2007 | 7/18/2007 | 7/18/2007 9:48:46 AM | A | PASS |
|
|
bud - st al''s in the south tower on the 1st floor Phone #: ###-#### as noted on print ok
|
ELE06-04493
| Final | 7/17/2007 | 7/18/2007 | 7/18/2007 8:43:51 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 7/17/2007 at 1:59:55 PM. Contact: ###-####. correction made
|
ELE06-00711
| Final | 7/18/2007 | 7/18/2007 | 7/18/2007 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 7/18/2007 at 11:10:30 AM. Contact: ###-####.
|