FIR10-00583
| INSP-Sprinkler Rough-in/Hydro | 7/18/2011 | 7/18/2011 | 7/18/2011 3:57:45 PM | P | CANC |
|
|
Request for a hydro for this afternoon was cancelled by Miguel when I arrived on site.
|
FIR11-00313
| INSP-Final Inspection | 7/13/2011 | 7/18/2011 | 7/18/2011 3:56:08 PM | A | FAIL |
|
|
Provide plan modifications showing the notification devices located on the correct circuits and the corrected candellas. Provide correct data sheets for the devices actually installed. The audible notification devices utilized a solid tone, not temporal. Research indicated that the fire alarm system was updated after the requirement for the temporal sound. Documentation needs to be provided indicating otherwise or the audible sound needs to be modified.
|
FIR11-00167
| INSP-Sprinkler Rough-in/Hydro | 7/15/2011 | 7/18/2011 | 7/18/2011 11:58:53 AM | A | PASS |
|
|
The above ground hydro test passed and the corrections have been made to the above ground piping. Piping can be covered.
|
FIR11-00269
| INSP-Final Inspection | 7/15/2011 | 7/18/2011 | 7/18/2011 9:43:51 AM | A | CANC |
|
|
No inspection performed. To be rescheduled with the other project fire alarm permit.
|
FIR11-00319
| INSP-Final Inspection | 7/15/2011 | 7/18/2011 | 7/18/2011 9:42:55 AM | A | FAIL |
|
|
The inspection was stopped with no devices tested due to the fire alrm scope of work not matching the building permit scope of work. Also notification needs to be added in the Copy Room.
|