Inspections for the day of: Monday, July 18, 2011.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00462 Site Preparation7/15/20117/18/20117/19/2011 9:33:34 AMAPASS
Will be completed by the end of today. Will do a site final on 7/20/2011PM.
ESC10-00786 Complaint Inspection7/18/20117/18/20117/18/2011 4:42:50 PMPFAIL
Verbal to RP:
Must temporarly stabilize the slopes due to the compplaint from dust and also no having any sediment barriers installed along the slope and the paved parking lot. Recommended for a temporary measure of utilizng a chemical application. Then when the weather is permitting it to begin final stabilization measures. Will re-nspect on 7/25/2011AM.
ESC11-00120 Conference7/12/20117/18/20117/18/2011 4:35:34 PMACANC
ESC10-00670 Site Preparation7/18/20117/18/20117/18/2011 4:35:28 PM PART
Project BMP's will be installed no later than 7/19/2011PM. All activities until 7/20/2011 will be occuring within the building.

Discussed with the RP over the stock pile of hazardous waste products. We have been informed that the cataloge the products and we have asked for a copy of the manifest report. Will follow up with the report and that all bmp's are installed correct per manufactures specification. Will inspect on 7/20/2011AM.
ESC11-00409 Site Preparation7/18/20117/18/20117/18/2011 2:23:45 PM NR
ESC11-00404 Site Preparation7/18/20117/18/20117/18/2011 2:22:41 PM NR
ESC10-00786 General Inspection7/18/20117/18/20117/18/2011 2:09:00 PMPCANC
Wrong Date
ESC10-00894 General Inspection7/18/20117/18/20117/18/2011 1:53:06 PM PASS
ESC11-00326 BMP Violation7/14/20117/18/20117/18/2011 12:02:05 PMAPASS
ESC11-00234 General Inspection7/18/20117/18/20117/18/2011 12:01:49 PM NR
Left a message to contact the city or myself to find out if he is scheduled for the next RP class due to his certification has expired. Will follow up on 7/20/2011 with the status of the RP. If he is not signed up a 24hour notice will be placed of the project to provide a valid RP.
ESC11-00492 Site Preparation7/18/20117/18/20117/18/2011 8:55:30 AM NR