Inspections for the day of: Wednesday, July 18, 2012.
Number of inspections: 17
Percentage of inspections complete: 88 %
Percentage of inspections not complete: 12 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00449 Site Preparation7/12/20127/12/2012   
ESC12-00582 Site Preparation7/13/20127/13/2012   
BLD12-01502 BLD-Final7/18/20127/18/20127/18/2012 4:35:10 PMPDONE
Ray Phone #: ###-####
BLD12-01502 DOC - Permit Finaled7/18/20127/18/20127/18/2012 4:34:53 PMPPASS
BLD12-00763 BLD-Wall Bracing7/18/20127/18/20127/18/2012 4:00:16 PMPNR
gumby Phone #: ###-####. Contractor not ready. Aslo noted to contractor that he needs to be using 16 guage staples, 1.75 inches long as per plans and engineering. curently had 17 guage staples 1.5 inches long.
BLD12-00673 BLD-Wall Bracing7/18/20127/18/20127/18/2012 3:18:10 PMPPASS
Ready at 11:30 Phone #: ###-#### >> Inspection requested via web by Leonard Dooms
BLD12-00872 BLD-Framing/Rough-in7/17/20127/18/20127/18/2012 3:17:45 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Clint Wall. Check for insulation at cantelver area at patio south side. ok to insulate.
ESC12-00557 Random Inspection7/18/20127/18/20127/18/2012 1:49:03 PMPPART
BLD12-01439 BLD-Foundation7/17/20127/18/20127/18/2012 1:48:30 PMPPART
Eric Phone #: ###-####. All steel in place. Work in progress on stacking remaining form boards in front (south end). Also discussed bolt placement and holdwn placement with concrete contractor.
BLD12-01260 BLD-Final7/17/20127/18/20127/18/2012 11:46:57 AMAPASS
Thanks Matt. Phone #: ###-#### >> Inspection requested via web by Richard Schultz
BLD12-01260 DOC - Permit Finaled7/18/20127/18/20127/18/2012 11:46:46 AMPPASS
BLD12-01556 BLD-Foundation7/16/20127/18/20127/18/2012 10:30:58 AMAPASS
Phone #: 2089410987 >> Inspection requested via mobile web by Bill
ESC12-00597 Random Inspection7/18/20127/18/20127/18/2012 10:30:34 AMAPASS
ESC12-00530 General Inspection7/18/20127/18/20127/18/2012 10:30:17 AMAPASS
BLD12-01331 BLD-Framing/Rough-in7/17/20127/18/20127/18/2012 10:29:54 AMAFAIL
robert Phone #: ###-####. Provide the 2x4 scabs on top chords of trusses C3,C4, and CE5 asper the truss engineering. Strap top plate at gas penetration and strap the double LVL to trimmers by existing structure, ok to insulate. Correction notice posted.
GCB12-00028 GCB-Framing7/17/20127/18/20127/18/2012 9:23:34 AMAPART
Robert @ ###-####
AM inspection requested
Framing for facade. Needs to provide the correct track splice at corners and justify condition of simpson holdowns. ok to cover.
GCB12-00084 GCB-Final7/17/20127/18/20127/18/2012 8:39:21 AMAPASS
Justin @ ###-####
Re-Roof. All work appeared to be done in acordance with local codes and ordinances.