ELE17-02649
| Final | 7/17/2018 | 7/18/2018 | 7/18/2018 2:20:44 PM | P | PART |
|
|
This is another partial final. Contact is Andy Chambers Phone #: ###-#### Inspection requested via web by Scott Campbell...remaining extended stay rms and swing rms
|
ELE18-02217
| Permanent Service | 7/18/2018 | 7/18/2018 | 7/18/2018 1:20:58 PM | P | PASS |
|
|
Thank you. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE...
moving existing service to end of building...refeeding existing panel and adding one to exterior by meter
p/s overhead ok to connect
|
ELE18-02106
| Final | 7/17/2018 | 7/18/2018 | 7/18/2018 12:44:04 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Benson...GFI protection for hot tub installed...at time of inspection wood gazeboo built around and over hot tub...no power but for hot tub out to area...informed homeowner of clearances for outlets and lighting and he stated no future wiring to be done
|
ELE18-02106
| Electrical Rough-In | 7/18/2018 | 7/18/2018 | 7/18/2018 12:40:47 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kevin Benson...circuit piped out back of panel and down wall on exterior...pvc pipe...thhn wire to hot tub disconnect...50A
|
ELE18-02698
| Conference | 7/17/2018 | 7/18/2018 | 7/18/2018 11:04:59 AM | A | PASS |
|
|
call 30 mins Elizabeth Phone #: ###-####...pamphlet given...homeowner competent...brother in law helping
|
ELE17-04091
| Final | 7/18/2018 | 7/18/2018 | 7/18/2018 9:45:39 AM | A | PASS |
|
|
close permit...service complete and power on
|
ELE18-02610
| Conference | 7/11/2018 | 7/18/2018 | 7/18/2018 9:44:29 AM | A | PASS |
|
|
Cesar Phone #: ###-####...wiring complete at time of inspection...rough in scheduled and resulted
|
ELE18-02610
| Electrical Rough-In | 7/18/2018 | 7/18/2018 | 7/18/2018 9:43:42 AM | A | PASS |
|
|
Cesar Phone #: ###-####...walls and ceiling ok to cover...second rough inspection needs scheduled once feeds to house are installed and grounding for house panel
|
ELE18-02665
| Electrical Rough-In | 7/18/2018 | 7/18/2018 | 7/18/2018 9:01:38 AM | A | PASS |
|
|
delta ground...verified by pictures due to time constrainsts on concrete pour
|
ELE18-01381
| Final | 7/18/2018 | 7/18/2018 | 7/18/2018 8:52:56 AM | P | PASS |
|
|
Hopefully the homeowner will be there, but I did take pictures of the corrections that were done. Phone #: ###-#### Inspection requested via web by Troy Cobb....ok to final
|
ELE18-01381
| Final | 7/17/2018 | 7/18/2018 | 7/18/2018 8:47:30 AM | A | CANC |
|
|
rescheduled final from 7/17; Phone #: ###-####...scheduled for PM
|
ELE18-01840
| Final | 7/16/2018 | 7/18/2018 | 7/18/2018 8:46:53 AM | A | FAIL |
|
|
Install 1 customer supplied monument sign,. ALL PRIMARY POWER BY OTHERS. Phone #: ###-#### Inspection requested via web by Ken Olsen...disconnect or plackard with circuit location shall be installed on sign
|
ELE18-01840
| Electrical Rough-In | 7/16/2018 | 7/18/2018 | 7/18/2018 8:45:32 AM | A | PASS |
|
|
Install 1 customer supplied monument sign,. ALL PRIMARY POWER BY OTHERS. Phone #: ###-#### Inspection requested via web by Ken Olsen...UL listed equipment verified
|
ELE18-02553
| Electrical Rough-In | 7/17/2018 | 7/18/2018 | 7/17/2018 2:44:25 PM | A | CANC |
|
|
rough in on LED fixtures Phone #: ###-#### >> Inspection requested via web by Tim Dunlop Inspection cancelled from web by: Tim Dunlop
|