Inspections for the day of: Wednesday, July 18, 2018.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-02649 Final7/17/20187/18/20187/18/2018 2:20:44 PMPPART
This is another partial final. Contact is Andy Chambers Phone #: ###-#### Inspection requested via web by Scott Campbell...remaining extended stay rms and swing rms
ELE18-02217 Permanent Service7/18/20187/18/20187/18/2018 1:20:58 PMPPASS
Thank you. Phone #: ###-#### Inspection requested via web by CHRIS CARMINE...

moving existing service to end of building...refeeding existing panel and adding one to exterior by meter

p/s overhead ok to connect
ELE18-02106 Final7/17/20187/18/20187/18/2018 12:44:04 PMPPASS
Phone #: ###-#### Inspection requested via web by Kevin Benson...GFI protection for hot tub installed...at time of inspection wood gazeboo built around and over hot tub...no power but for hot tub out to area...informed homeowner of clearances for outlets and lighting and he stated no future wiring to be done
ELE18-02106 Electrical Rough-In7/18/20187/18/20187/18/2018 12:40:47 PMPPASS
Phone #: ###-#### Inspection requested via web by Kevin Benson...circuit piped out back of panel and down wall on exterior...pvc pipe...thhn wire to hot tub disconnect...50A
ELE18-02698 Conference7/17/20187/18/20187/18/2018 11:04:59 AMAPASS
call 30 mins Elizabeth Phone #: ###-####...pamphlet given...homeowner competent...brother in law helping
ELE17-04091 Final7/18/20187/18/20187/18/2018 9:45:39 AMAPASS
close permit...service complete and power on
ELE18-02610 Conference7/11/20187/18/20187/18/2018 9:44:29 AMAPASS
Cesar Phone #: ###-####...wiring complete at time of inspection...rough in scheduled and resulted
ELE18-02610 Electrical Rough-In7/18/20187/18/20187/18/2018 9:43:42 AMAPASS
Cesar Phone #: ###-####...walls and ceiling ok to cover...second rough inspection needs scheduled once feeds to house are installed and grounding for house panel
ELE18-02665 Electrical Rough-In7/18/20187/18/20187/18/2018 9:01:38 AMAPASS
delta ground...verified by pictures due to time constrainsts on concrete pour
ELE18-01381 Final7/18/20187/18/20187/18/2018 8:52:56 AMPPASS
Hopefully the homeowner will be there, but I did take pictures of the corrections that were done. Phone #: ###-#### Inspection requested via web by Troy Cobb....ok to final
ELE18-01381 Final7/17/20187/18/20187/18/2018 8:47:30 AMACANC
rescheduled final from 7/17; Phone #: ###-####...scheduled for PM
ELE18-01840 Final7/16/20187/18/20187/18/2018 8:46:53 AMAFAIL
Install 1 customer supplied monument sign,. ALL PRIMARY POWER BY OTHERS. Phone #: ###-#### Inspection requested via web by Ken Olsen...disconnect or plackard with circuit location shall be installed on sign
ELE18-01840 Electrical Rough-In7/16/20187/18/20187/18/2018 8:45:32 AMAPASS
Install 1 customer supplied monument sign,. ALL PRIMARY POWER BY OTHERS. Phone #: ###-#### Inspection requested via web by Ken Olsen...UL listed equipment verified
ELE18-02553 Electrical Rough-In7/17/20187/18/20187/17/2018 2:44:25 PMACANC
rough in on LED fixtures Phone #: ###-#### >> Inspection requested via web by Tim Dunlop Inspection cancelled from web by: Tim Dunlop