BLD18-01931
| BLD-Framing/Rough-in | 7/18/2018 | 7/18/2018 | 7/18/2018 5:02:12 PM | P | PASS |
|
|
Travis Phone #: ###-####
|
BLD18-01678
| BLD-Framing/Rough-in | 7/18/2018 | 7/18/2018 | 7/18/2018 4:27:34 PM | P | FAIL |
|
|
Jach Phone #: ###-####. Neesd to complete airseal proir to framing inspection. Complete lateral bracing on A4 and A5 trusses. nail 3ply girder truss per the truss engineering. Strap double top plate breaks from addition to existing structure. Correction notice issued.
|
ESC18-00841
| Site Final | 7/18/2018 | 7/18/2018 | 7/18/2018 2:49:31 PM | P | DONE |
|
|
|
ESC18-00841
| DOC - Permit Finaled | 7/18/2018 | 7/18/2018 | 7/18/2018 2:49:23 PM | P | PASS |
|
|
|
BLD18-01529
| BLD-Final | 7/17/2018 | 7/18/2018 | 7/18/2018 2:49:14 PM | P | PASS |
|
|
Steve Burton Phone #: ###-####
|
BLD18-01529
| DOC - Permit Finaled | 7/18/2018 | 7/18/2018 | 7/18/2018 2:48:41 PM | P | PASS |
|
|
|
BLD18-02294
| BLD-Final | 7/17/2018 | 7/18/2018 | 7/18/2018 2:38:54 PM | P | NR |
|
|
Lisa Phone #: ###-####. Fire/life/safety failed.
|
BLD17-01025
| BLD-Ceiling Grid Inspection | 7/18/2018 | 7/18/2018 | 7/18/2018 1:42:13 PM | P | PASS |
|
|
2nd floor // Tom Phone #: ###-####
|
BLD18-01618
| BLD-Framing/Rough-in | 7/17/2018 | 7/18/2018 | 7/18/2018 1:41:59 PM | P | PASS |
|
|
call 15 mins ahead- Larren Phone #: ###-####. Vapor barrier under floor framing and blocking for load path on 3 ply grder .
|
BLD18-01618
| BLD-Conference | 7/18/2018 | 7/18/2018 | 7/18/2018 1:40:54 PM | P | DONE |
|
|
call 15 mins ahead- Larren Phone #: ###-####
|
BLD18-02453
| BLD-Final | 7/16/2018 | 7/18/2018 | 7/18/2018 11:23:37 AM | A | DONE |
|
|
Please call Matt with any issues. Thanks Phone #: ###-#### Inspection requested via web by Matt Oranday
|
BLD18-02453
| DOC - Permit Finaled | 7/18/2018 | 7/18/2018 | 7/18/2018 11:23:29 AM | P | PASS |
|
|
All work appeared to be done in accordance with local codes and ordinances.
|
BLD18-01424
| BLD-Framing/Rough-in | 7/17/2018 | 7/18/2018 | 7/18/2018 11:00:57 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover. Complete lateral bracing on A01 trusses. OK to insulate. Correction notice posted.
|
BLD17-03632
| BLD-Wall cover | 7/17/2018 | 7/18/2018 | 7/18/2018 9:40:07 AM | A | PASS |
|
|
Jim Phone #: ###-#### Inspection requested via web by Jim Wellman
|
BLD17-03632
| BLD-Energy code compliance | 7/18/2018 | 7/18/2018 | 7/18/2018 9:39:57 AM | A | PASS |
|
|
Jim Phone #: ###-#### Inspection requested via web by Jim Wellman
|
BLD17-03632
| BLD-Framing/Rough-in | 7/17/2018 | 7/18/2018 | 7/18/2018 9:39:26 AM | A | PASS |
|
|
Jim Phone #: ###-#### Inspection requested via web by Jim Wellman. All issues have been resolved. Ok to insulate.
|
BLD18-01658
| BLD-Final | 7/17/2018 | 7/18/2018 | 7/18/2018 9:20:34 AM | A | PASS |
|
|
11am- Aaron Phone #: ###-####. All work per scope of work has been completed. Ok to release bond.
|
BLD18-01658
| DOC - Permit Finaled | 7/18/2018 | 7/18/2018 | 7/18/2018 9:19:59 AM | P | PASS |
|
|
|
BLD17-02871
| BLD-Wall Bracing | 7/17/2018 | 7/18/2018 | 7/18/2018 9:06:14 AM | A | PASS |
|
|
John Phone #: ###-####. All exterior shear walls ok for cover.
|