ELE19-02434
| Electrical Rough-In | 7/17/2019 | 7/18/2019 | 7/18/2019 2:41:38 PM | P | PASS |
|
|
Jim Phone #: ###-####.... approval for cover...requiring a 2nd rough inspection be scheduled before final to inspect make up of boxes...home currently being lived in
|
ELE19-01072
| Final | 7/18/2019 | 7/18/2019 | 7/18/2019 2:15:11 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher...work completed ok to final
|
ELE17-02560
| ELE-Aging Inspection | 7/18/2019 | 7/18/2019 | 7/18/2019 2:09:12 PM | | PASS |
|
|
made contact with Lori...said she will check into..may have been pulled by accident or will get required inspections scheduled
|
ELE19-00678
| Final | 7/18/2019 | 7/18/2019 | 7/18/2019 1:12:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by shane miller...ok to final
|
ELE19-01779
| Final | 7/18/2019 | 7/18/2019 | 7/18/2019 12:18:29 PM | P | PASS |
|
|
Hope this is in time, didn''t know that rough in inspections are required. Thank you, Ardis Phone #: ###-#### Inspection requested via web by Ardis Cox...signs complete...ok to final
|
ELE19-01779
| Electrical Rough-In | 7/18/2019 | 7/18/2019 | 7/18/2019 12:18:02 PM | P | PASS |
|
|
Hope this is in time, didn''t know that rough in inspections are required. Thank you, Ardis Phone #: ###-#### Inspection requested via web by Ardis Cox...UL listing verified and disconnect from ground...future inspections will need to be scheduled before installation and done at ground level
|
ELE19-01087
| Final | 7/18/2019 | 7/18/2019 | 7/18/2019 12:11:42 PM | P | CANC |
|
|
Okay the rough in is scheduled also. thank you, Ardis Phone #: ###-#### Inspection requested via web by Ardis Cox... discussed with Mark ...install manager for contractor...is aware of sign requirement inspections...said will get resolved and recall
|
ELE19-01087
| Electrical Rough-In | 7/18/2019 | 7/18/2019 | 7/18/2019 12:10:25 PM | P | CANC |
|
|
Hi, sorry didn''t know this one was required. thank you, Ardis Phone #: ###-#### Inspection requested via web by Ardis Cox..
corrections not made
|
ELE19-01812
| Final | 7/17/2019 | 7/18/2019 | 7/18/2019 11:38:00 AM | A | PASS |
|
|
6363 is code to get in Phone #: ###-#### Inspection requested via web by Chris Berthelot... ok to final
|
ELE19-01802
| Final | 7/18/2019 | 7/18/2019 | 7/18/2019 11:23:19 AM | P | CANC |
|
|
Hello, inspection is for the First Interstate Banks wall signs. Thank you, Ardis Phone #: ###-#### >> Inspection requested via web by Ardis Cox Inspection cancelled from web by: Ardis Cox
|
ELE19-01802
| Electrical Rough-In | 7/18/2019 | 7/18/2019 | 7/18/2019 11:23:17 AM | P | CANC |
|
|
Hello, inspection is for the First Interstate Banks wall signs. Thank you, Ardis Phone #: ###-#### >> Inspection requested via web by Ardis Cox Inspection cancelled from web by: Ardis Cox
|
ELE19-01333
| Final | 7/18/2019 | 7/18/2019 | 7/18/2019 10:37:34 AM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Laurie Hoelscher... 1..Boise City ordinance-a rough inspection shasll be scheduled before a final can be given...no inspection was ever scheduled 2..appropriate connectors shall be used in underground junction boxes...both locations
|
ELE19-02489
| Final | 7/17/2019 | 7/18/2019 | 7/18/2019 10:07:05 AM | A | PASS |
|
|
Final please Phone #: ###-#### Inspection requested via web by Kendra Lanham...circuits complete and panel labelled...ok to final
|
ELE19-02489
| Electrical Rough-In | 7/18/2019 | 7/18/2019 | 7/18/2019 10:06:23 AM | A | PASS |
|
|
Final please Phone #: ###-#### Inspection requested via web by Kendra Lanham... rated floor outlets installed for display cabinets register cabinet fed with M/C and metal boxes
|
ELE19-02654
| Rough-In Permanent Service | 7/17/2019 | 7/18/2019 | 7/18/2019 9:26:44 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mike Okamura... rough of A/C circuit ok...will need A/C set for final p/s u/g new ok
|
ELE19-02655
| Rough-In Permanent Service | 7/17/2019 | 7/18/2019 | 7/18/2019 9:15:39 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Mike Okamura... 1..service shall have a grounding electrode system 2..feed to mobile home shall be a minimum 18" underground
|
ELE19-02133
| Electrical Rough-In | 7/17/2019 | 7/18/2019 | 7/18/2019 8:46:39 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mike Okamura...m/c to A/C disconnect...no A/C set yet...will need for final and verify breaker in mobile home
|
ELE19-02393
| Permanent Service | 7/17/2019 | 7/18/2019 | 7/18/2019 8:15:32 AM | A | PASS |
|
|
Von is the contact. Phone #: ###-#### Inspection requested via web by Buster Bowen... p/s u/g new ok
|