BLD18-04186
| BLD-Aging Inspection | 7/18/2019 | 7/18/2019 | 7/19/2019 3:31:49 PM | | PASS |
|
|
the permit final was passed on 3/5/19 by Jim Sly
|
BLD18-03667
| BLD-Final | 7/18/2019 | 7/18/2019 | 7/18/2019 4:10:04 PM | P | NR |
|
|
Joe Phone #: ###-####//need electrical final//need fire final//new sidewalks and ADA ramp to be poured 7/19/19//
|
BLD17-03138
| BLD-Conference | 7/18/2019 | 7/18/2019 | 7/18/2019 3:34:44 PM | P | DONE |
|
|
WIDEN- please call for access Phone #: ###-####//advised new permit was needed//foundation changes and setback changes to what was previously permitted//will need to find property pins for setback inspections once new permit is issued//
|
BLD18-03121
| BLD-Framing/Rough-in | 7/18/2019 | 7/18/2019 | 7/18/2019 2:38:00 PM | P | PART |
|
|
Matt Phone #: ###-####//framing corrections made//call for insulation on 103,104,203,204,303,304//
|
BLD19-00612
| BLD-Final | 7/17/2019 | 7/18/2019 | 7/18/2019 1:46:45 PM | P | PASS |
|
|
call for access- before 5pm please- Kimberly Phone #: ###-####//no work completed//fire life safety passed//suite ok per approved plans//
|
BLD19-00754
| BLD-Wall Bracing | 7/16/2019 | 7/18/2019 | 7/18/2019 1:18:08 PM | P | NR |
|
|
Dave Phone #: ###-####//add sblocking at braced locations as on plans//
|
BLD19-00889
| BLD-Conference | 7/18/2019 | 7/18/2019 | 7/18/2019 1:17:35 PM | P | DONE |
|
|
caller thinks the side setbacks are not 5'' Phone #: ###-####//verified setbacks at footing and foundation with concrete contractor from survey points on the lot//all points measured at the inspections were completed with a string line running from survey pins//
|
BLD19-01077
| BLD-Final | 7/18/2019 | 7/18/2019 | 7/18/2019 12:24:37 PM | P | PART |
|
|
Please call 30 minutes ahead Phone #: ###-#### Inspection requested via web by Gerome Fries//temp occupancy approved for phase 1 minor remodel//life safety and electrical have passed in this area//no temp occupancy signature area on card//
|
BLD19-02174
| BLD-Footing | 7/17/2019 | 7/18/2019 | 7/18/2019 11:44:10 AM | A | PASS |
|
|
Chris- stem wall inspection Phone #: ###-####//wall rebar ok per engineering and plans//
|
BLD19-01891
| BLD-Energy code compliance | 7/16/2019 | 7/18/2019 | 7/18/2019 11:30:37 AM | A | PASS |
|
|
Caleb Phone #: ###-####
|
BLD19-02245
| BLD-Framing/Rough-in | 7/17/2019 | 7/18/2019 | 7/18/2019 11:16:40 AM | P | CANC |
|
|
We needed to schedule a afternoon inspection once hvac is completed. Thanks Phone #: ###-#### >> Inspection requested via web by Dustin Collins Inspection cancelled from web by: Dustin Collins
|
BLD19-01154
| BLD-Wall Bracing | 7/17/2019 | 7/18/2019 | 7/18/2019 11:08:36 AM | A | PART |
|
|
shear // Shawn Phone #: ###-####//need portal frame clarifiaction//all other shear ok//
|
BLD19-01411
| BLD-Framing/Rough-in | 7/17/2019 | 7/18/2019 | 7/18/2019 10:42:46 AM | A | NR |
|
|
Vinnie Phone #: ###-####//need plumbing rough in passed///
|
BLD19-01411
| BLD-Energy code compliance | 7/17/2019 | 7/18/2019 | 7/18/2019 10:42:14 AM | A | CANC |
|
|
Vinnie Phone #: ###-####
|
BLD19-02312
| BLD-Framing/Rough-in | 7/17/2019 | 7/18/2019 | 7/18/2019 10:30:11 AM | A | PASS |
|
|
Kevin-Phone #: ###-####//need smoke and CO detectors prior to final//sprinkler sysem will be installed within rooms at ceiling level//cover walls and patches only//
|
BLD19-02363
| BLD-Framing/Rough-in | 7/17/2019 | 7/18/2019 | 7/18/2019 10:07:44 AM | A | NR |
|
|
Molly Phone #: ###-####//need HVAC rough in pass//call for re-inspection//
|
BLD19-01271
| BLD-Energy code compliance | 7/18/2019 | 7/18/2019 | 7/18/2019 9:56:54 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover
|
BLD19-01271
| BLD-Framing/Rough-in | 7/18/2019 | 7/18/2019 | 7/18/2019 9:56:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kelly Stover//corrections made//
|
BLD18-04486
| BLD-Blower Door Test Results | 7/18/2019 | 7/18/2019 | 7/18/2019 9:39:27 AM | A | DONE |
|
|
5.9 ACH 43CFM 25Pa
|
BLD18-04486
| BLD-Final | 7/17/2019 | 7/18/2019 | 7/18/2019 9:36:28 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by James Jackson//final complete//
|
BLD18-04486
| DOC - Permit Finaled | 7/18/2019 | 7/18/2019 | 7/18/2019 9:36:07 AM | P | PASS |
|
|
|
BLD19-00911
| BLD-Framing/Rough-in | 7/17/2019 | 7/18/2019 | 7/18/2019 9:12:39 AM | A | NR |
|
|
Robin Phone #: ###-####//need verification on blocking at I joists//need fire sprinkler and alarm permits and inspections prior to any cover on project//call for re-inspection after fire inspection//
|
BLD19-02245
| BLD-Framing/Rough-in | 7/17/2019 | 7/18/2019 | 7/17/2019 8:59:55 PM | A | CANC |
|
|
The HVAC inspection scheduled to be completed in the morning. f you can give me a 30 minute notice we will meet you at the jobsite for access. 2089605165.'' Thanks, Dustin Phone #: ###-#### Inspection requested via web by Dustin Collins Inspection cancelled from web by: Dustin Collins
|