BLD1056326
| INSP - Final | 7/19/1995 | 7/19/1995 | 7/19/1995 12:00:00 AM | P | NR |
|
|
REHAB JOB
|
BLD1056360
| INSP - Footings | 7/19/1995 | 7/19/1995 | 7/19/1995 12:00:00 AM | P | NR |
|
|
HAD BRIEF PRE CONST CONF...FTGS NOT READY,WILL REQUIRE SPEC. INSP AS SOME DEFICIENCIES NOTED IN SOILS AT FTG GRADE BY MATL'S TESTING. REQ'D TIMELY LOGS AND REPORTS FROM SPEC. INSP AND NOTICE TO US.
|
BLD95-00130
| INSP - Carpentry | 7/19/1995 | 7/19/1995 | 7/19/1995 12:00:00 AM | P | FAIL |
|
|
FDN BOLTS, POST FTG SIZE INADEQUATE.
|
BLD95-00238
| INSP - Footings | 7/19/1995 | 7/19/1995 | 7/19/1995 12:00:00 AM | P | NR |
|
|
NR
|
BLD95-00356
| INSP - Final | 7/19/1995 | 7/19/1995 | 7/19/1995 12:00:00 AM | P | PASS |
|
|
FINAL ON DEMO. STRUCT OK, NEED SEWER CAP VERIFICATION...NOTIFIED CATHY W. 7-20-95
|
BLD95-00361
| INSP - Foundation | 7/19/1995 | 7/19/1995 | 7/19/1995 12:00:00 AM | P | PASS |
|
|
|