BLD00-00589
| BLD-Framing/Rough-in | 7/18/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | | FAIL |
|
|
jim Lough ###-#### C/N left- engineering on beam 7/19/00 3:26:28 PM
|
BLD99-03405
| BLD-Framing/Rough-in | 7/18/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | A | FAIL |
|
|
call 25 min. prior ###-#### to meet there Need mec. check- & finish shear nailing- waiting for letter from engineer. 7/19/00 3:27:12 PM
|
BLD00-01945
| BLD-Footing | 7/18/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | A | PART |
|
|
###-####- JERRY-- FT Work in progress 7/19/00 3:25:42 PM
|
BLD00-01175
| BLD-Footing | 7/18/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | A | PART |
|
|
JERRY ###-#### FT--FOR HOUSE Work in progress 7/19/00 3:26:17 PM
|
BLD00-01771
| BLD-Foundation | 7/18/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | A | PART |
|
|
FOR HOMEOWNER-- DEANNA-- ###-####--- FOUND--INSP FORMS ARE ON BACK PATIO -ON TOP Footing & stem walls already poured 7/19/00 3:26:42 PM
|
BLD98-03564
| BLD-Energy code compliance | 7/18/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | A | PART |
|
|
wALLY ###-#### Need mech. sign off- B-4 cover- energy ok. 7/19/00 3:25:58 PM
|
BLD00-01354
| BLD-Foundation | 7/18/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | A | PART |
|
|
john ###-#### Already poured wall. 7/19/00 3:26:10 PM
|
BLD00-01828
| BLD-Footing | 7/14/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | A | CANC |
|
|
cell--###-####--nathan ft---scheduled for 7/18/00 for ft
|
BLD00-01316
| BLD-Framing/Rough-in | 7/17/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | P | PASS |
|
|
###-#### Ok to insulate/no elec. in building 7/20/00 8:45:33 AM
|
BLD00-01888
| BLD-Framing/Rough-in | 7/18/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | P | PART |
|
|
walt --- ###-#### CALL 1ST BEFORE INSP C/N left- verify mech sign off (rough) ok to insulate 7/20/00 8:45:18 AM
|
BLD99-03593
| BLD-Final | 7/19/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | P | PASS |
|
|
doug ###-#### C of C issued #19741 7/20/00 8:44:39 AM
|
BLD00-01828
| BLD-Footing | 7/19/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | P | PART |
|
|
nathan ###-#### Work in progress 7/20/00 8:44:59 AM
|
BLD00-01582
| BLD-Footing | 7/19/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | P | PART |
|
|
Gale ###-#### Forms not all the way UP. (cautioned on the side set back). 7/20/00 8:45:59 AM
|
BLD00-01175
| BLD-Foundation | 7/19/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | P | PART |
|
|
###-####---tony found wall insp Already poured 7/20/00 8:44:50 AM
|
BLD00-00981
| BLD-Final | 7/19/2000 | 7/19/2000 | 7/19/2000 12:00:00 AM | P | PASS |
|
|
Mark ###-####please call before you go out.
|
MEC00-02362
| Pressure Test | 7/14/2000 | 7/19/2000 | 7/18/2000 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 07/14/2000 at 10:17:35. Contact: ###-####.--------CALL 1ST BEFORE --APRIL OR REED---###-#### Disp set to [CANC] by a contractor via Hello! on 07/18/2000 at 08:30:17.
|