BLD01-01428
| BLD-Foundation | 7/18/2001 | 7/19/2001 | 7/19/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-03720
| BLD-Foundation | 7/18/2001 | 7/19/2001 | 7/19/2001 12:00:00 AM | A | PART |
|
|
brent ###-####
wip, verbal corrections 7/19/2001 10:24:05 AM
|
BLD01-01940
| BLD-Footing | 7/18/2001 | 7/19/2001 | 7/19/2001 12:00:00 AM | A | PART |
|
|
ft brian- ###-####
wip, verbal corrections 7/19/2001 11:38:14 AM
|
BLD01-01783
| BLD-Final | 7/18/2001 | 7/19/2001 | 7/19/2001 12:00:00 AM | A | PASS |
|
|
###-#### call first
|
BLD01-01174
| BLD-Framing/Rough-in | 7/18/2001 | 7/19/2001 | 7/19/2001 12:00:00 AM | A | PART |
|
|
###-####
ok to side w/ marked corrections on shear, t/w sider, he said he will nail as he goes up, need to block and nail panel to left of front garage door also 7/19/2001 10:31:23 AM
|
BLD00-03176
| BLD-Conference | 7/19/2001 | 7/19/2001 | 7/19/2001 12:00:00 AM | A | PART |
|
|
Stair configuration ok, Handrail to be installed on inside of winder and meet height,width and clearances.
|
BLD00-01484
| BLD-Energy code compliance | 7/19/2001 | 7/19/2001 | 7/19/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/19/2001 at 07:46:12. Contact: ###-####.
|
BLD01-01315
| BLD-Footing | 7/19/2001 | 7/19/2001 | 7/19/2001 12:00:00 AM | P | PART |
|
|
###-####
wip, verbal warnings 7/19/2001 4:13:37 PM
|
BLD01-01363
| BLD-Footing | 7/19/2001 | 7/19/2001 | 7/19/2001 12:00:00 AM | P | PART |
|
|
footings Phil ###-#### Dave ###-####
|
BLD01-01363
| BLD-Foundation | 7/19/2001 | 7/19/2001 | 7/19/2001 12:00:00 AM | P | PART |
|
|
see footing for #'s
|
BLD01-01363
| BLD-Framing/Rough-in | 7/19/2001 | 7/19/2001 | 7/19/2001 12:00:00 AM | P | PART |
|
|
see footing for #'s
pole portion ok, verbal corrections on roof 7/19/2001 4:17:27 PM
|