Inspections for the day of: Tuesday, July 19, 2005.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC05-02159 Final7/19/20057/19/20057/20/2005 4:40:39 PMPPASS
furnace and a/c, late if possible, if there are any issues, please call Lynn ###-####; Phone #: ###-#### Internet Inspection Request from: Stephanie Smith already inspected
PLM05-02411 Water and/or Sewer7/19/20057/19/20057/20/2005 3:27:01 PMPPART
from tie in at meter to the last fire hydrant ok
MEC05-02246 Pressure Test7/18/20057/19/20057/20/2005 2:12:07 PMPPASS
Please inspect as early as possible. Call with any problems. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS alan did this yesterday
MEC05-02246 Final7/18/20057/19/20057/20/2005 2:11:40 PMPPASS
Please inspect as early as possible. Call with any problems. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS alan did this yesterday
PLM05-02428 Plumbing Rough-in7/14/20057/19/20057/20/2005 8:11:54 AMPPASS
casey - ###-#### ri ok with water in ceiling protected from freezing
PLM05-02398 Plumbing Rough-in7/19/20057/19/20057/19/2005 2:11:43 PMPCANC
Phone #: ###-#### Internet Inspection Request from: Kim Alderson oops dup inspection request
PLM05-01069 Final7/19/20057/19/20057/19/2005 1:59:13 PMPPASS
1:30 final ok
PLM05-01851 Water and/or Sewer7/19/20057/19/20057/19/2005 1:27:36 PMPPART
Scheduled by a contractor via Hello! on 7/19/2005 at 10:12:12 AM. Contact: ###-####. service line to the building ok. needs connection to building and test.
PLM05-02400 Plumbing Rough-in7/18/20057/19/20057/19/2005 10:43:02 AMAPASS
Scheduled by a contractor via Hello! on 7/18/2005 at 4:07:47 PM. Contact: ###-####. ri ok
PLM05-02398 Plumbing Rough-in7/18/20057/19/20057/19/2005 10:30:37 AMAPASS
Scheduled by a contractor via Hello! on 7/18/2005 at 4:08:53 PM. Contact: ###-####. ri ok
PLM05-02467 Plumbing Rough-in7/19/20057/19/20057/19/2005 9:22:25 AMAPASS
Scheduled by a contractor via Hello! on 7/19/2005 at 7:29:16 AM. Contact: ###-####. ri ok
PLM05-02463 Sprinkler (Final)7/18/20057/19/20057/19/2005 8:56:44 AMAFAIL
oscar-- ###-#### no test remove tee upstream of the dcva
PLM05-02462 Sprinkler (Final)7/18/20057/19/20057/19/2005 8:56:02 AMAFAIL
oscar ###-#### no test remove tee upstream of the dcva
PLM05-02461 Sprinkler (Final)7/18/20057/19/20057/19/2005 8:41:55 AMAFAIL
jj-- ###-#### no test, shutoff and drain look shallow.
PLM04-03273 Sprinkler (Final)7/19/20057/19/20057/19/2005 8:31:17 AMACANC
oops should be a final
PLM05-02446 Water and/or Sewer7/18/20057/19/20057/19/2005 8:09:43 AMACANC
###-#### - glen gz's gotit
PLM04-03273 Final7/19/20057/19/20057/19/2005 12:00:00 AMAPASS
have sprinkler permit final ok