Inspections for the day of: Wednesday, July 19, 2006.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00395 INSP-Final Inspection7/19/20067/19/20067/19/2006 3:50:09 PMPPASS
Permit finaled. Sprinkler work shown for the new office located at the rear of the store was not needed since the office was not built.
BLD06-00241 FIRE-Final Inspection7/19/20067/19/20067/19/2006 3:48:44 PMPFAIL
Still need sprinkler final
FIR06-00447 INSP-Final Inspection7/19/20067/19/20067/19/2006 3:48:14 PMPFAIL
Pendant heads are too close to the face of the cabinets.
BLD04-02738 FIRE-Final Inspection7/18/20067/19/20067/19/2006 11:55:28 AMAPASS
Life safety finaled. Structural inspector please verify that the door to unit B4 closes properly. The contractor was having problems with it and was working on it when I left.
BLD04-02740 FIRE-Final Inspection7/18/20067/19/20067/19/2006 11:54:20 AMAPASS
Life safety finaled