FIR04-00349
| FIR-Aging Inspection | 7/19/2010 | 7/19/2010 | 7/20/2010 8:37:03 AM | | NR |
|
|
Jeff stated that it will be scheduled with the last phase of the newer permit.
|
FIR10-00300
| INSP-Sprinkler Rough-in | 7/19/2010 | 7/19/2010 | 7/19/2010 3:57:50 PM | P | PASS |
|
|
The sprinkler piping in the master bedroom can be covered. I discussed with Richard the requirement for me to verify underground supply piping bury depth and flushing prior to cover.
|
BLD09-01091
| FIRE-Final Inspection | 7/15/2010 | 7/19/2010 | 7/19/2010 3:48:46 PM | A | FAIL |
|
|
A thumb turn manual dead bolt has been installed on the only exit from the procedure room. This hardware needs to be single action lever type. I was ok with this same hardware on on the secondary exit from the adjoining restroom since the primary exit has approved hardware.
|
BLD10-00780
| FIRE-Final Inspection | 7/16/2010 | 7/19/2010 | 7/19/2010 1:05:28 PM | A | FAIL |
|
|
There are issues with the project related fire alarm permit. Life safety will be ok to temp when the fire alarm issue has been addressed.
|
FIR10-00307
| INSP-Sprinkler Rough-in/Hydro | 7/16/2010 | 7/19/2010 | 7/19/2010 1:01:46 PM | A | FAIL |
|
|
The duct smoke detectors and tamper switches tested ok but the facp went into trouble. I left and later returned to the project to see if the issue had been resolved and found that the technicians were still trouble shooting.
|
FIR10-00258
| INSP-Supply line flush | 7/16/2010 | 7/19/2010 | 7/19/2010 10:11:37 AM | A | PASS |
|
|
The underground flush passed.
|
FIR10-00256
| INSP-Sprinkler Rough-in | 7/16/2010 | 7/19/2010 | 7/19/2010 10:10:48 AM | A | FAIL |
|
|
I met Mike and Jared on site but there were no city approved plans to perform an inspection with. No inspection was performed.
|
FIR10-00256
| INSP-Supply line flush | 7/16/2010 | 7/19/2010 | 7/19/2010 10:09:48 AM | A | PASS |
|
|
The underground flush passed.
|