Inspections for the day of: Friday, July 19, 2013.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
GCE13-00115 GCE-Rough-In Permanent Service7/24/20137/19/20137/24/2013 4:49:04 PMPCANC
###-####
GCE13-00114 GCE-Rough-In Permanent Service7/24/20137/19/20137/24/2013 4:42:56 PMPPASS
###-#### Rough in ok cover p/s u/g n ok
GCE13-00047 GCE-Rough-In7/24/20137/19/20137/24/2013 4:41:03 PMPPASS
###-#### Final ok
GCE13-00117 GCE-Temporary Service7/19/20137/19/20137/22/2013 7:59:10 AMPPASS
Phone #: ###-#### t/s u/g n ok
GCE13-00115 GCE-Rough-In Permanent Service7/19/20137/19/20137/22/2013 7:59:06 AMPFAIL
###-#### BCC 4-05-31 (C)- All unfused conductors shall be installed in a rigidmetal or IMC or sch.80 PVC.
If Mettallic raceway is used a bonding bushing shall be used if receway enters through concentric knock-outs as per 250.92
GCE13-00114 GCE-Rough-In Permanent Service7/19/20137/19/20137/19/2013 2:07:17 PMPPASS
###-#### Rough in ok cover p/s u/g n ok
ELE12-00549 Final7/19/20137/19/20137/19/2013 1:11:04 PMPPASS
Grey Phone #: ###-#### Final ok
ELE08-01084 ELE-Aging Inspection7/19/20137/19/20137/19/2013 12:40:52 PM DONE
Still under construction
ELE13-01629 Final7/19/20137/19/20137/19/2013 12:26:12 PMPPASS
Pat Phone #: ###-#### Final ok
ELE13-01389 Final7/19/20137/19/20137/19/2013 11:59:37 AMPPASS
Boise HS should be unlocked so inspector can get in and do the final inspection. If there is a problem getting in please call the contractor, Shawn Gafford at ###-####. Phone #: ###-#### >> Inspection requested via web by Judy Spencer Final ok
ELE13-01693 Final7/19/20137/19/20137/19/2013 11:43:29 AMPPASS
Troy Phone #: ###-#### Final ok
ELE13-00967 Final7/18/20137/19/20137/19/2013 10:50:40 AMAPASS
Phone #: ###-#### >> Inspection requested via web by John VanZandt
Final ok
ELE13-01896 Electrical Rough-In7/18/20137/19/20137/19/2013 10:33:42 AMAPASS
Phone #: ###-#### >> Inspection requested via web by JENNY EMEL
Wall rough in ok cover
ELE13-01888 Final7/19/20137/19/20137/19/2013 10:16:41 AMPPASS
Final ok
ELE13-01888 Electrical Rough-In7/18/20137/19/20137/19/2013 10:15:35 AMAPASS
mini split system. job is complete. Phone #: ###-#### >> Inspection requested via web by Stuart Welton Rough in ok
ELE13-01895 Final7/19/20137/19/20137/19/2013 10:08:25 AMPPASS
Permit created for conference reference MIS13-00200
ELE13-01895 Conference7/18/20137/19/20137/19/2013 9:57:32 AMADONE
Brad Phone #: ###-#### Electical contractor needed to sign off on whole house. Either remove drywall or use camera to inspect wiring in walls, arc fault protection mandatory, tamper resistant recepticals, service corrections, and spark rings where needed.
MIS13-00200 Set Bond Amount7/19/20137/19/20137/19/2013 9:56:25 AMPFAIL
Conference performed. ELE contractor to sign off on whole house. Either remove drywall or photograph stud bays, arc fault mandatory, tamper resistant recepticals, service corrections, and spark rings.
ELE13-01881 Final7/18/20137/19/20137/19/2013 9:03:40 AMAPASS
Temp Pole Phone #: ###-#### >> Inspection requested via web by Rowdy Monroe
temp pole final ok
ELE13-01881 Temporary Service7/19/20137/19/20137/19/2013 9:02:52 AMPPASS
Temp Pole Phone #: ###-#### >> Inspection requested via web by Rowdy Monroe
t/s u/g n ok
ELE13-01303 Final7/19/20137/19/20137/19/2013 8:53:24 AMAPASS
Call Dene for access code.
Thank you Phone #: ###-#### >> Inspection requested via web by kim grundhauser
Final ok
ELE13-01017 Final7/19/20137/19/20137/19/2013 8:51:35 AMAPASS
Call Dene for access code.
Thank you Phone #: ###-#### >> Inspection requested via web by kim grundhauser
Final ok
ELE13-01291 Electrical Rough-In7/18/20137/19/20137/18/2013 2:01:18 PMAPASS
tony Phone #: ###-#### Outer ramp floor 1 to 2 rough in ok cover