Inspections for the day of: Wednesday, July 19, 2017.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01189 Conference7/19/20177/19/20177/24/2017 2:21:37 PMPCANC
ESC16-00288 General Inspection7/19/20177/19/20177/21/2017 2:14:32 PM CANC
ESC16-00808 General Inspection7/19/20177/19/20177/21/2017 2:14:21 PM CANC
ESC17-00004 Site Final7/18/20177/19/20177/20/2017 8:19:12 AMAPASS
TI complete. No construction materials left onsite, no disturbed area. Cafe is occupied. No ESC corrections.
ESC17-00282 Site Final7/19/20177/19/20177/19/2017 12:48:51 PMPPASS
Home complete, landscaped, and materials cleaned. ESC permit satisfied/finaled.
ESC17-00080 Site Final7/19/20177/19/20177/19/2017 12:48:36 PMPPASS
Home complete, landscaped, and materials cleaned. ESC permit satisfied/finaled.
ESC16-01735 Site Final7/19/20177/19/20177/19/2017 12:48:24 PMPPASS
Home complete, landscaped, and materials cleaned. ESC permit satisfied/finaled.
ESC15-01420 General Inspection7/19/20177/19/20177/19/2017 12:25:40 PM PASS
WIP on SFHs. Most lots now occupied.

No sediment runoff, but still need to stabilize the common area at west end of sub above the undergound stormwater pipe. Currently be used for dumping and stockpiling. Will continue to monitor and ESC permit shall remain open until addressed.
ESC17-00625 General Inspection7/19/20177/19/20177/19/2017 12:08:57 PMPPASS
No activity at Roe St. Townhomes. Permit and SWPPP info posted. No trackout, from site. No wind blown dust issues observed or reported.
ESC16-01012 DOC - Permit Finaled7/19/20177/19/20177/19/2017 12:03:40 PMPPASS
ESC16-01300 General Inspection7/19/20177/19/20177/19/2017 11:51:54 AM PASS
Parking lot and site improvment complete. No loose dirt or other construction materials. Onsite stormwater retention system installed. ESC permit finaled.
ESC16-01300 DOC - Permit Finaled7/19/20177/19/20177/19/2017 11:51:14 AMPPASS
ESC16-01373 Aging Inspection7/19/20177/19/20177/19/2017 11:36:24 AM PASS
Work complete.. BLD finaled. No ESC corrections.
ESC16-01373 DOC - Permit Finaled7/19/20177/19/20177/19/2017 11:27:24 AMPPASS
ESC17-00395 Random Inspection7/19/20177/19/20177/19/2017 11:25:40 AMPPART
WIP on storm drainage system at subdivsion entrance, with excess dirt still onsite. Trackout in sidewalk, gutter, and bikelane. Does not extend down McMillan beyond site.

Will re-inspect next week to see if trackout has been swept up.
ESC17-00414 General Inspection7/19/20177/19/20177/19/2017 11:04:31 AMAFAIL
No DI bag replacement. Rest of Dropzone and CBH projects in compliance.

CBH RP Colby on site. Issued verbal correction. He said he would do it, as well as provide new lined washout for next round of foundations.
ESC04-00494 DOC - Permit Finaled7/19/20177/19/20177/19/2017 10:45:20 AMPPASS
old expired permit; no inspection
ESC17-00143 Site Final7/19/20177/19/20177/19/2017 10:39:57 AMPPASS
Home complete, BLD finaled. Whitecloud subdivision in good condition. Active homes have trash containment. Temp BMPs for subdivision (DI bags , concrete washout) to remain for active construction.
ESC17-00187 Site Final7/19/20177/19/20177/19/2017 10:39:43 AMPPASS
Home complete, BLD finaled. Whitecloud subdivision in good condition. Active homes have trash containment. Temp BMPs for subdivision (DI bags , concrete washout) to remain for active construction.
ESC17-00758 Site Final7/19/20177/19/20177/19/2017 10:39:29 AMPPASS
Home complete, BLD finaled. Whitecloud subdivision in good condition. Active homes have trash containment. Temp BMPs for subdivision (DI bags , concrete washout) to remain for active construction.
ESC16-01491 Site Final7/19/20177/19/20177/19/2017 10:39:13 AMPPASS
Home complete, BLD finaled. Whitecloud subdivision in good condition. Active homes have trash containment. Temp BMPs for subdivision (DI bags , concrete washout) to remain for active construction.
ESC16-01108 General Inspection7/19/20177/19/20177/19/2017 10:30:21 AM PASS
WIP on SFHs by Hayden Homes.

Granite Excavation no longer onsite, houses have seperate ESC permits. No discharges, spills or other issues. Trash containers provided, lined concrete washout is being utilized. No dust or significant trackout.

Approved.
ESC16-01191 Aging Inspection7/19/20177/19/20177/19/2017 7:47:05 AM PASS
BLD finaled. No ESC issues/corrections.
ESC16-01191 DOC - Permit Finaled7/19/20177/19/20177/19/2017 7:46:45 AMPPASS