ELE18-02600
| Electrical Rough-In | 7/18/2018 | 7/19/2018 | 7/19/2018 2:13:09 PM | P | NR |
|
|
Brian Prussia, crew lead. Install is taking place on 7/19 at 1 pm. Phone #: ###-#### Inspection requested via web by BRS Permitting No one on site. Called contact which stated job has been rescheduled to next week but forgot to call and cancel inspection. Will recall when ready.
|
ELE18-02711
| Final | 7/18/2018 | 7/19/2018 | 7/19/2018 10:19:23 AM | A | PASS |
|
|
Final Phone #: ###-#### Inspection requested via web by JENNY EMEL Final ok
|
ELE18-02711
| Electrical Rough-In | 7/18/2018 | 7/19/2018 | 7/19/2018 10:18:54 AM | A | PASS |
|
|
Ceiling for cover Phone #: ###-#### Inspection requested via web by JENNY EMEL Grid rough in ok cover
|
ELE18-02231
| Conference | 7/18/2018 | 7/19/2018 | 7/19/2018 9:41:54 AM | A | DONE |
|
|
Please call Brandon Sailors a call 30 minutes prior to anticipated arrival time. THANKS Phone #: ###-#### Inspection requested via web by Kelly Tarter Discussed requirements for changing or refeeding services all changing from overhead to underground. Each service shall have a permit. Grounding electrode system shall be installed on each service. Available fault current shall posted prior to inspections, at least provide AFC value to ensure main breakers cover value. Not needed on services with no changes. All bonding shall be complete if needed. Some have IMC service risers and metallic nipples being installed. Inspections will not need after hours inspections. Contractor to have all grounding electrodes in place, and will confirm bonding if needed on final. Some services to be reconnected with no changes needed.
|