NAF18-00006
| INSP-Sprinkler Rough-in/Hydro | 7/18/2018 | 7/19/2018 | 7/19/2018 1:46:26 PM | P | PASS |
|
|
Third floor hydro test and third floor rough-in passed. Piping can be covered.
RUDY IS OUR FOREMAN ON THIS PROJECT Phone #: ###-#### Inspection requested via web by Brad Bettencourt
|
FIR18-00548
| INSP-Sprinkler Rough-in | 7/18/2018 | 7/19/2018 | 7/19/2018 9:34:32 AM | A | PART |
|
|
There were no plans for the first floor so the rough-in was not performed, second floor rough-in passed except for plans show a pendant in a bedroom entry that was not installed, third floor is missing a pendant head in a living room and some sort of "cap" is needed to retain heat in the shafts the 2" supply piping is installed in. In short the second floor sprinkler piping can be covered, the first and third can not be covered.
Robert Chambers is the contact for this rough to cover inspection. He will be at another job site so he will need advance notice when meeting time is. We are sorry for the inconvenience on the inspection scheduled the day before. We appreciate your help. Thank you Phone #: ###-#### Inspection requested via web by Stan Beus
|
BLD18-00285
| FIRE-Final Inspection | 7/18/2018 | 7/19/2018 | 7/19/2018 8:37:41 AM | A | PASS |
|
|
Life safety passed. I spot checked rooms for painted heads, verified functionality of exit signs/emergency lights, tags on fire extinguishers, annual inspection for fire sprinkler system.
Phone #: ###-#### Inspection requested via web by David Jeffs
|