MEC19-00059
| Final | 7/18/2019 | 7/19/2019 | 7/19/2019 3:30:19 PM | P | PART |
|
|
Field super: Daryl Thomas Phone #: ###-#### Inspection requested via web by Lisa Whitney - range vent needs a mechanical permit pulled - need installation specs for fireplace to check finish materials clearances - furnace ac coil exhaust fans dryer vent etc ok
|
MEC19-02789
| Rough-in | 7/19/2019 | 7/19/2019 | 7/19/2019 2:42:16 PM | P | FAIL |
|
|
PLEASE CALL HVAC TECH PATRICK WHEN EN ROUTE Phone #: ###-#### Inspection requested via web by SOPHIA FLEMING - Man J needs to reflect whats being installed onsite
|
MEC19-01807
| Pressure Test | 7/18/2019 | 7/19/2019 | 7/19/2019 2:05:47 PM | P | PASS |
|
|
Contact: Robert Church ###-#### Phone #: ###-#### Inspection requested via web by Brent Lacy - 60lb gas pressure test ok
|
MEC19-00917
| Final | 7/16/2019 | 7/19/2019 | 7/19/2019 1:31:57 PM | P | PASS |
|
|
Mike ###-#### Phone #: ###-#### Inspection requested via web by Mike Almanza - final ok
|
MEC19-03083
| Final | 7/17/2019 | 7/19/2019 | 7/19/2019 1:18:54 PM | P | PASS |
|
|
Please call Dave on your way - ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - furnace ac coil co ok
|
MEC19-02802
| Rough-in | 7/12/2019 | 7/19/2019 | 7/19/2019 11:53:28 AM | A | FAIL |
|
|
Builder Contact: Jason ###-#### A1 Heating Contact: Daniel ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - insulation sheild installed on common vent both in attic and between 1st and 2nd floor - cover combustion air vent in floor
|
MEC19-02802
| Pressure Test | 7/12/2019 | 7/19/2019 | 7/19/2019 11:50:43 AM | A | PASS |
|
|
Builder Contact: Jason ###-#### A1 Heating Contact: Daniel ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - 20lb gas pressure test ok - tagged meter location
|
MEC19-03008
| Rough-in | 7/12/2019 | 7/19/2019 | 7/19/2019 11:50:18 AM | A | FAIL |
|
|
Builder Contact: Jason ###-#### A1 Heating Contact: Daniel ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - insulation sheild between 1st and 2nd floor and 1" clearances on common vent - cover combustion air vent in floor - line set insulation in crawl needs rips fixed and line set has a kink at a 90 degree bend -
|
MEC19-03008
| Pressure Test | 7/12/2019 | 7/19/2019 | 7/19/2019 11:48:06 AM | A | PASS |
|
|
Builder Contact: Jason ###-#### A1 Heating Contact: Daniel ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - 20lb gas pressure test ok - tagged meter location
|
MEC19-03007
| Rough-in | 7/12/2019 | 7/19/2019 | 7/19/2019 11:47:42 AM | A | FAIL |
|
|
Builder Contact: Jason ###-#### A1 Heating Contact: Daniel ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - insulation sheild between 1st and 2nd floor on the common vent - return duct on 2nd floor needs insulated and sealed - line set insulation in crawl needs rips repaired -cover combustion air vent in floor
|
MEC19-03007
| Pressure Test | 7/12/2019 | 7/19/2019 | 7/19/2019 11:45:21 AM | A | PASS |
|
|
Builder Contact: Jason ###-#### A1 Heating Contact: Daniel ###-#### Phone #: ###-#### Inspection requested via web by Arielle Hendricks - 20lb gas pressure test ok - tagged meter location
|
MEC19-02922
| Final | 7/19/2019 | 7/19/2019 | 7/19/2019 11:36:54 AM | A | FAIL |
|
|
-secondary drain needs a wet switch installed - line set insulation needs repaired in crawl and in garage where it is supported to the duct work - condensate pump needs safety wired in to air handler - line set penetration needs sealed and conduit penetration needs sealed at A/C - -
|
MEC19-02865
| Final | 7/18/2019 | 7/19/2019 | 7/19/2019 11:02:39 AM | A | PASS |
|
|
Please call James at ###-#### for access information if no one is home, thanks. Inspection requested via web by 4 Seasons - final ok
|
MEC19-03091
| Final | 7/18/2019 | 7/19/2019 | 7/19/2019 10:35:55 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette - A/C coil co ok
|
MEC19-03061
| Final | 7/17/2019 | 7/19/2019 | 7/19/2019 10:26:40 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette - furnace ac coil co ok
|
MEC19-02852
| Rough-in | 7/18/2019 | 7/19/2019 | 7/19/2019 10:03:18 AM | A | PASS |
|
|
Please contact Glen at ###-#### if needed. Phone #: ###-#### Inspection requested via web by Crystal Grant - R/I cover of ceiling phase 1 ok
|
MEC19-02814
| Final | 7/18/2019 | 7/19/2019 | 7/19/2019 9:48:18 AM | A | FAIL |
|
|
Units are in mechanical room --Code for door is 0331 Phone #: ###-#### Inspection requested via web by Justin Osterhout - need to see an electrical permit pulled for final of mech permit - A/C coil ok
|
MEC19-02815
| Final | 7/18/2019 | 7/19/2019 | 7/19/2019 9:47:46 AM | A | FAIL |
|
|
Units are in mechanical room --Access code is 0331 Phone #: ###-#### Inspection requested via web by Justin Osterhout - need to see electrical permit pulled to final mec permit - A/C coil ok
|
MEC19-00162
| Final | 7/18/2019 | 7/19/2019 | 7/19/2019 8:39:02 AM | A | PASS |
|
|
Contact will be Steve Tow ###-#### Phone #: ###-#### Inspection requested via web by Debbie Marino - final ok - will sign occ card when other mechanical permit passes final inspection
|
MEC18-05826
| Mec-Aging Inspection | 7/19/2019 | 7/19/2019 | 7/19/2019 8:31:10 AM | | FAIL |
|
|
This permit has not been active since 12/4/18. Schedule inspection with homeowner if work is finished. Permit will expire at next aging inspection if not active.
|