BLD96-01738
| INSP-Final Inspection | 7/1/1997 | 7/2/1997 | 7/2/1997 12:00:00 AM | A | PASS |
|
|
07/01/97 406 - 8 -8:15 REINSP FOR FINAL OK FOR PERM OCC
|
BLD96-02261
| INSP-Sprinkler Rough-in/Hydro | 7/1/1997 | 7/2/1997 | 7/2/1997 12:00:00 AM | A | PASS |
|
|
07/01/97 406 - AT 9 A.M. WITNESTED TRIP TESTS OF 2 DP SYSTEMS AFTER SPLIT OF 1 SYST EACH SYST NOW LESS THAN 750 GAL. ALSO PICKED UP REVISED PLANS AND REV CA
|
BLD96-02389
| INSP-Sprinkler Rough-in/Hydro | 7/2/1997 | 7/2/1997 | 7/2/1997 12:00:00 AM | P | FAIL |
|
|
07/02/97 406 - FINAL FAIL SPKLR HEADS TOO CLOSE FRONT DOOR AND GUARD RA ON APPROVED PLANS ON SITE ANTI FREEZE LOOP CONTROL VLVS NOT MONITORED SIGNAGE FOR ACCESSIBLE RESRROOMS
|
BLD96-01238
| INSP-Final Inspection | 7/1/1997 | 7/2/1997 | 7/2/1997 12:00:00 AM | P | FAIL |
|
|
07/01/97 406 - HE SAID YOU WOULD MEET AT 2 O'CLOCK FINAL FAIL ALARM SYSTEM SUBMITTAL DUCT DET NOT HOOKED UP CAN NOT SEE FIRE DAMPERS TO VERIFY IF THEY CLOSE SPKLR SYSTEM OK
|