Inspections for the day of: Monday, July 2, 2001.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-02077 BLD-Aging Inspection7/2/20017/2/20017/2/2001 12:00:00 AM PASS
BLD01-00850 BLD-Aging Inspection7/2/20017/2/20017/2/2001 12:00:00 AM PASS
wip 7/2/2001 9:16:58 AM
BLD01-00671 BLD-Aging Inspection7/2/20017/2/20017/2/2001 12:00:00 AM PASS
wip 7/2/2001 9:15:54 AM
BLD01-01704 BLD-Footing7/2/20017/2/20017/2/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 07/02/2001 at 07:29:55. Contact: ###-####.foundation wall, ftgs are done,,,wip 7/2/2001 11:00:00 AM
BLD00-03033 BLD-Final6/29/20017/2/20017/2/2001 12:00:00 AMAFAIL
###-####
c/ n posted 7/2/2001 10:14:25 AM
BLD00-03033 BLD-Final6/29/20017/2/20017/2/2001 12:00:00 AMAFAIL
###-####
c/ n posted 7/2/2001 10:14:25 AM
BLD01-01352 BLD-Framing/Rough-in6/29/20017/2/20017/2/2001 12:00:00 AMAPART
###-####
c/n posted, ok to insulate 7/2/2001 11:54:42 AM
MEC01-01919 Final6/29/20017/2/20017/2/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 06/29/2001 at 13:04:07. Contact: ###-####.
need gas line and finish framing around 7/2/2001 10:59:16 AM
BLD00-00848 BLD-Final6/29/20017/2/20017/2/2001 12:00:00 AMACANC
Final reinspect
BLD01-01298 BLD-Framing/Rough-in6/29/20017/2/20017/2/2001 12:00:00 AMAPART
SHEAR WALL TERRY ###-####
ext. shear ok 7/2/2001 11:17:48 AM
BLD01-01225 BLD-Final7/2/20017/2/20017/2/2001 12:00:00 AMPPASS
kip 1-###-#### fire is also going out pm today
health dept. did not sign but left paper work that said ok after fixes and I verified new fixtures 7/2/2001 4:07:55 PM
BLD01-00691 BLD-Framing/Rough-in7/2/20017/2/20017/2/2001 12:00:00 AMPPART
Mark ###-####
c/n posted, ext nailing ok/// verify hold downs and eng. fix at frame insp. 7/2/2001 2:13:12 PM
BLD01-01043 BLD-Framing/Rough-in7/2/20017/2/20017/2/2001 12:00:00 AMPPART
###-####
concrete bleachers and steps, no plans on site, appears ok 7/2/2001 3:42:07 PM
MIS01-00119 BLD-Conference7/2/20017/2/20017/2/2001 12:00:00 AMPPASS
Harry ###-####
c/n posted to get engineering and submit plans for bp /// may have to remove what is up now unless eng. provides letter of compliance. 7/2/2001 2:53:26 PM
MIS01-00119 BLD-Conference7/2/20017/2/20017/2/2001 12:00:00 AMPPASS
Harry ###-####
c/n posted to get engineering and submit plans for bp /// may have to remove what is up now unless eng. provides letter of compliance. 7/2/2001 2:53:26 PM
BLD01-01015 BLD-Footing7/2/20017/2/20017/2/2001 12:00:00 AMPPART
###-####
BLD01-01579 BLD-Framing/Rough-in7/2/20017/2/20017/2/2001 12:00:00 AMPPASS
###-####