ELE02-02005
| Temporary Service | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 13:41:21. Contact: ###-####. cor. posted called need gfci for 220 volt 7/2/2002 1:46:40 PM
|
ELE02-01950
| Electrical Rough-In | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 15:12:36. Contact: ###-####. needs 11/4 inch for MC cable and remove new drain pipe from below panels 7/2/2002 11:35:33 AM met with contractor 7/2/2002 11:35:46 AM
|
ELE02-01300
| Final | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 21:18:17. Contact: ###-####. ok 7/2/2002 10:23:28 AM
|
ELE02-02003
| Electrical Rough-In | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 07/02/2002 at 06:42:12. Contact: ###-####. corrections not made, needs 11/4 inch for cables, and new violation 314.43 no nails in non metallic boxes as code states called 7/2/2002 12:20:27 PM
|
ELE02-01311
| Final | 6/28/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 06/28/2002 at 15:48:47. Contact: ###-####. conference only 7/2/2002 11:06:32 AM
|
ELE02-01591
| Final | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | NR |
|
|
dan- ###-#### fn needs light for panel and concrete encased electrode 7/2/2002 10:45:01 AM
|
ELE02-01889
| Electrical Rough-In | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | FAIL |
|
|
DAVID ###-#### PLEASE CALL BEFORE SO DAVID CAN MEET YOU THERE.. cor. posted met with owner, 314.20 outside light box, 404.9(B) grd switches, 300.4 11/4 for cables, 210.52(B)(1)(2) wire new dinning rm addition with 20 amp small appliance branch circuit 7/2/2002 4:12:35 PM
|
ELE02-01441
| Final | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | FAIL |
|
|
TODD ###-#### cor. posted 314.16 box fill island counters, 410.8 needs globe for closet fixture, 406.8 needs bubble covers all outside outlets, called left message 7/2/2002 3:37:15 PM
|
ELE02-01786
| Final | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | CANC |
|
|
ALISON ###-#### see added p/s inspection 7/2/2002 4:44:01 PM
|
ELE02-01552
| Electrical Rough-In | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | PART |
|
|
ok for cover , cor. posted needs gfci receptacles front and back 7/2/2002 2:38:53 PM
|
ELE02-00775
| Final | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | NR |
|
|
contractor called and canceled 7/2/2002 3:08:55 PM
|
ELE02-02003
| Electrical Rough-In | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | FAIL |
|
|
r/i- rowdy ###-#### called all corrections not made still needs 11/4 inch for cables $45.00 reinspection fee due 7/2/2002 5:19:20 PM
|
ELE02-01786
| Permanent Service | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | FAIL |
|
|
cor.posted called 11o.26(F)(1) needs clearence for service panel, 250.52,or 104, grd within 5 ft if u.g metal pipe if not bond water, 33415 protect exposed romex above panel, note check for overcurrent protction for branch circuits all breakers are 20 amp
|
ELE01-02800
| Final | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | PART |
|
|
checked on service drop clearence for Sharon at Id Power under PM#ele01-03343 p/s o/h rec. ok
|