Inspections for the day of: Tuesday, July 2, 2002.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR01-00422 INSP-Final Inspection7/1/20027/2/20027/2/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/01/2002 at 14:22:58. Contact: ###-####.
BLD01-02531 FIRE-Final Inspection7/1/20027/2/20027/2/2002 12:00:00 AMANR
###-#### DON
BLD99-01404 FIRE-Final Inspection7/1/20027/2/20027/2/2002 12:00:00 AMAPASS
###-#### DON
BLD01-01935 FIRE-Hydro test above ground7/1/20027/2/20027/2/2002 12:00:00 AMAPASS
RICK ###-#### hydro complete on above, UG and FDC 7/2/2002 10:26:22 AM
BLD01-03261 FIRE-Final Inspection7/1/20027/2/20027/2/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 07/01/2002 at 16:00:52. Contact: ###-####.
FIR02-00005 INSP-Sprinkler Rough-in/Hydro7/1/20027/2/20027/2/2002 12:00:00 AMANR
SAM ###-#### Sam didn't have the latest approved a job shack; talked to Greg on phone and they will have plans for pm inspection on 7/3/02 7/2/2002 3:52:43 PM
FIR02-00254 INSP-Final Inspection7/1/20027/2/20027/2/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 07/01/2002 at 11:06:26. Contact: ###-####.
FIR02-00255 INSP-Final Inspection7/1/20027/2/20027/2/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 07/01/2002 at 11:07:39. Contact: ###-####.
FIR01-00298 INSP-Final Inspection7/1/20027/2/20027/2/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 07/01/2002 at 13:45:44. Contact: ###-####.
FIR02-00166 INSP-Sprinkler Rough-in/Hydro7/2/20027/2/20027/2/2002 12:00:00 AMPPASS
Scheduled by Inspector: 409 On 7/2/2002 8:47:18 AM UG hydro complete 7/2/2002 10:30:07 AM
FIR02-00208 INSP-Sprinkler Rough-in/Hydro7/2/20027/2/20027/2/2002 12:00:00 AMPPASS
Added by Inspector: 409 On 7/2/2002 8:48:41 AM hydro complete; awaiting alarms 7/2/2002 10:31:17 AM
FIR02-00185 INSP-Sprinkler Rough-in/Hydro7/2/20027/2/20027/2/2002 12:00:00 AMPPART
Scheduled by Inspector: 409 On 7/2/2002 12:44:50 PM hydro completed; need bell; tape off heads; anti freeze solution; test alarms 7/2/2002 2:27:54 PM
FIR01-00053 INSP-Sprinkler Rough-in/Hydro7/2/20027/2/20027/2/2002 12:00:00 AMPPASS
Scheduled by Inspector: 409 On 7/2/2002 3:40:19 PM alarms were complete and tested 7/2/2002 3:41:38 PM