MEC02-01792
| Rough-in | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | FAIL |
|
|
B J ###-#### posted corrections 7/2/2002 9:57:10 AM
|
MEC02-01792
| Pressure Test | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | FAIL |
|
|
B J ###-#### leak 7/2/2002 9:57:19 AM
|
MEC02-01465
| Final | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 14:17:11. Contact: ###-####.
|
MEC02-01444
| Rough-in | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | NR |
|
|
for conduit- jim- ###-#### waiting on engineer 7/2/2002 11:30:59 AM
|
MEC02-01724
| Rough-in | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | FAIL |
|
|
TODD ###-#### no f/p installed 7/2/2002 4:39:17 PM
|
MEC02-01740
| Rough-in | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | FAIL |
|
|
TODD ###-#### posted corrections called joe 7/2/2002 4:39:29 PM
|
MEC02-01789
| Rough-in | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 07/02/2002 at 07:30:58. Contact: ###-####.
|
MEC02-01799
| Rough-in | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | FAIL |
|
|
mike ###-#### r/i -call 1st before insp
|
MEC02-01802
| Final | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | PASS |
|
|
fn -maria- ###-#### ..five mile past franklin.right on bridgetower 7/2/2002 12:56:15 PM...###-#### 7/2/2002 1:09:59 PM
|
MEC02-01792
| Pressure Test | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | PASS |
|
|
|
MEC02-01694
| Rough-in | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 10:38:16. Contact: ###-####...roanoak to parkside 7/2/2002 12:49:09 PM cancelled by brent...not ready 7/2/2002 4:52:16 PM
|
MEC02-01694
| Pressure Test | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 07/01/2002 at 10:38:57. Contact: ###-####.
|