BLD02-00771
| FIRE-Conference | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | CANC |
|
|
steve-- ###-#### conf
|
FIR02-00152
| INSP-Sprinkler Rough-in/Hydro | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | FAIL |
|
|
hangers over the tax office still need to be relocated. Hydro test for the dry system is OK 7/2/2002 2:20:43 PM 7/2/2002 2:21:02 PM
|
FIR01-00624
| INSP-Sprinkler Rough-in/Hydro | 7/1/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | A | FAIL |
|
|
approved plans not on site for reinspection and the access panels to the attic space are screwed shut 7/2/2002 9:43:21 AM
|
BLD02-01365
| FIRE-Conference | 7/2/2002 | 7/2/2002 | 7/2/2002 12:00:00 AM | P | PASS |
|
|
insulation is now attached to deck 7/2/2002 3:50:05 PM
|