Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00671 BLD-Framing/Rough-in7/1/20037/2/20037/2/2003 12:00:00 AMAFAIL
camil ###-####. inspection left over from yesterday. 7/1/2003 5:26:17 PM. Items addressed at shear with builder have not been done no revised or approved plans on site. posted a c/n. 7/2/2003 1:44:46 PM
BLD03-01100 BLD-Framing/Rough-in7/1/20037/2/20037/2/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 7/1/2003 at 10:52:30 AM. Contact: ###-####.ok to side exterior, c/n for int shear 2 sides. 7/2/2003 11:38:16 AM
BLD03-01253 BLD-Final7/1/20037/2/20037/2/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 7/1/2003 at 12:27:13 PM. Contact: ###-####. 7/2/2003 2:51:44 PM. A perm oc will be ok after fire/life safety. c/n item ok.7/2/2003 2:52:05 PM 7/2/2003 2:52:17 PM
MEC03-01726 Pressure Test7/1/20037/2/20037/2/2003 12:00:00 AMPFAIL
###-#### A-1 Gauge only has 10 psi , failed. 7/2/2003 2:13:39 PM
BLD03-00321 BLD-Framing/Rough-in7/1/20037/2/20037/2/2003 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 7/1/2003 at 6:04:23 PM. Contact: ###-####. not ready recalled for am front canopy. 7/2/2003 3:38:38 PM
MEC03-01733 Rough-in7/2/20037/2/20037/2/2003 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 7/2/2003 at 9:29:07 AM. Contact: ###-####.. posetd a c/n. 7/2/2003 1:43:37 PM
BLD02-02719 BLD-Framing/Rough-in7/2/20037/2/20037/2/2003 12:00:00 AMPFAIL
7/2/2003 5:44:29 PM, went over areas with contractor marked with paint. 7/2/2003 5:45:47 PM
BLD02-01069 BLD-Framing/Rough-in7/2/20037/2/20037/2/2003 12:00:00 AMPFAIL
###-#### vincent fire caulking 7/2/2003 5:44:29 PM, went over areas with contractor marked with paint. 7/2/2003 5:45:54 PM
BLD02-02999 BLD-Framing/Rough-in7/2/20037/2/20037/2/2003 12:00:00 AMPPART
Ok pending engineers approval, contractor indicated letter to follow. 7/2/2003 1:30:33 PMOk pending engineers approval, contractor indicated letter to follow. 7/2/2003 1:30:42 PM
BLD02-03001 BLD-Framing/Rough-in7/2/20037/2/20037/2/2003 12:00:00 AMPPART
Ok pending engineers approval, contractor indicated letter to follow. 7/2/2003 1:30:33 PMOk pending engineers approval, contractor indicated letter to follow. 7/2/2003 1:30:49 PM