BLD07-00064
| FIRE-Final Inspection | 7/2/2007 | 7/2/2007 | 7/2/2007 6:47:37 PM | P | NR |
|
|
Inspection intended for a conference, not final.
|
FIR07-00559
| INSP-Final Inspection | 7/2/2007 | 7/2/2007 | 7/2/2007 6:38:53 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR07-00204
| INSP-Sprinkler Rough-in | 7/2/2007 | 7/2/2007 | 7/2/2007 3:05:23 PM | P | PART |
|
|
Rough-in inspection for the 2nd and 3rd floors completed, noted two heads exceed min. separation unless sheetrock is extended to the deck, ssu at the west stair landing does not meet req. distance from the deck, east stairway heads have not been installed at this time, noted field modifications for the 1st floor antifreeze loop to be indicated on as-built drawings, missing seismic bracing on the south antifreeze system main.
|
FIR07-00559
| INSP-Sprinkler Rough-in | 7/2/2007 | 7/2/2007 | 7/2/2007 2:12:25 PM | P | PART |
|
|
OH fire sprinkler modifications are acceptable, okay for cover at the drop ceilings.
|
FIR06-00540
| INSP-Sprinkler Rough-in/Hydro | 6/29/2007 | 7/2/2007 | 7/2/2007 2:11:32 PM | A | PART |
|
|
OH hydrostatic test for the wet system 1st floor NW quad passed.
|
FIR07-00234
| INSP-Sprinkler Rough-in/Hydro | 6/29/2007 | 7/2/2007 | 7/2/2007 11:45:26 AM | P | CANC |
|
|
Please call 1/2 hr prior to inspection. Brian F. is the contact. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus Inspection cancelled from web by: Stan Beus
|
BLD06-01488
| FIRE-Final Inspection | 6/29/2007 | 7/2/2007 | 7/2/2007 11:08:13 AM | A | NR |
|
|
Inspection to be rescheduled per conversation with contractor.
|
BLD06-03086
| FIRE-Final Inspection | 6/29/2007 | 7/2/2007 | 7/2/2007 11:03:58 AM | A | PASS |
|
|
Fire life safety inspection passed.
|