MEC07-01136
| Conference | 6/29/2007 | 7/2/2007 | 7/2/2007 5:09:41 PM | A | PEND |
|
|
meet lee to go over venting on w/h...lee unable to make it today due to meetings..i rescheduled for tues am and called luke
|
MEC07-02316
| Final | 7/2/2007 | 7/2/2007 | 7/2/2007 5:07:53 PM | P | PASS |
|
|
###-####
|
MEC07-02316
| Pressure Test | 7/2/2007 | 7/2/2007 | 7/2/2007 5:07:33 PM | P | PASS |
|
|
Please call Steve with any questions ###-#### Phone #: ###-#### Internet Inspection Request from: Sonja Hankel..100 lb test on hydronics ok
|
MEC07-02309
| Pressure Test | 7/2/2007 | 7/2/2007 | 7/2/2007 5:06:07 PM | P | PART |
|
|
Phone #: ###-#### Internet Inspection Request from: Scott Wickstrom...60lb u/g gas from meter in trench to other side of house ok
|
MEC07-02229
| Final | 7/2/2007 | 7/2/2007 | 7/2/2007 5:03:48 PM | P | PASS |
|
|
###-####
|
MEC07-02229
| Pressure Test | 7/2/2007 | 7/2/2007 | 7/2/2007 5:03:23 PM | P | PASS |
|
|
20lb gas to future range ok
|
MEC07-00263
| Final | 7/2/2007 | 7/2/2007 | 7/2/2007 4:57:56 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 7/2/2007 at 6:57:03 AM. Contact: ###-####.
|
MEC06-03288
| Final | 7/1/2007 | 7/2/2007 | 7/2/2007 4:08:21 PM | P | PEND |
|
|
Scheduled by a contractor via Hello! on 7/1/2007 at 3:00:12 PM. Contact: ###-####.... called matt and ask him to reschedule due to correction notice from troy
|
MEC07-01722
| Final | 7/2/2007 | 7/2/2007 | 7/2/2007 3:45:53 PM | P | FAIL |
|
|
Please do mechanical final inspection. Please call for access. Thank You! Phone #: ###-#### Internet Inspection Request from: Donnette Ellis...need access to roof...ken (builder) would like you to call him
|
MEC06-03899
| Final | 7/2/2007 | 7/2/2007 | 7/2/2007 3:45:03 PM | P | PASS |
|
|
|
MEC06-03899
| Pressure Test | 6/27/2007 | 7/2/2007 | 7/2/2007 3:44:46 PM | P | PASS |
|
|
Thanks, Andrea. Phone #: ###-#### x0000 Internet Inspection Request from: Andrea Creek
|
MEC07-00371
| Rough-in | 6/29/2007 | 7/2/2007 | 7/2/2007 12:25:03 PM | A | PASS |
|
|
John Hodgin is the field contact. Please call John before you show up to jobsite. Thanks Phone #: ###-#### Internet Inspection Request from: Heidi Mallet
|
MEC07-00712
| Final | 6/29/2007 | 7/2/2007 | 7/2/2007 12:24:20 PM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 6/29/2007 at 2:10:31 PM. Contact: ###-####...wrong address...permit not grouped to building permit
|
MEC07-02289
| Rough-in | 6/29/2007 | 7/2/2007 | 7/2/2007 11:03:26 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 6/29/2007 at 10:05:22 AM. Contact: ###-####.
|
MEC07-02234
| Final | 6/29/2007 | 7/2/2007 | 7/2/2007 10:53:20 AM | A | PASS |
|
|
joseph - pls call 30 mins prior; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
MEC07-02298
| Rough-in | 6/29/2007 | 7/2/2007 | 7/2/2007 10:00:58 AM | A | FAIL |
|
|
michael ###-####--call 1st before insp ..need comb air to equipment..frame around flue with 1" clearance..complete dryer vent
|