Inspections for the day of: Wednesday, July 2, 2008.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE08-00774 ELE-Aging Inspection7/2/20087/2/20087/8/2008 2:56:36 PM DONE
suc, could not find sign
ELE07-02302 Final7/1/20087/2/20087/2/2008 4:06:37 PMPCANC
Contact: Steve Hess. Final Inspections in "E" and "F" Phone #: ###-#### Internet Inspection Request from: Shelli Daylong power turned off, electrician in charge gone, foreman wants to have electrician in charge to administrate power selection- had to turn off because other trades using new power for construction
ESC08-00164 General Inspection7/2/20087/2/20087/2/2008 3:33:18 PMPPASS
looked ok
ESC07-00003 General Inspection7/2/20087/2/20087/2/2008 3:31:39 PMPPASS
looked ok
ESC08-00035 General Inspection7/2/20087/2/20087/2/2008 3:30:03 PMAPASS
looked ok
ESC08-00436 General Inspection7/2/20087/2/20087/2/2008 3:28:59 PMAPASS
looked okl
ESC08-00375 General Inspection7/2/20087/2/20087/2/2008 3:27:49 PMPPASS
looked ok
ELE08-01814 Electrical Rough-In7/2/20087/2/20087/2/2008 3:26:16 PMPPASS
ok to cover u/g, bonding ok
ELE08-01274 Final7/2/20087/2/20087/2/2008 3:24:56 PMPPASS
Scheduled by a contractor via Hello! on 7/2/2008 at 10:35:18 AM. Contact: ###-####. ok to final
ELE08-01384 Final7/2/20087/2/20087/2/2008 2:13:07 PMPPASS
Mike- call 30 min prior Phone #: ###-#### ok to final
ELE07-02302 Electrical Rough-In7/1/20087/2/20087/2/2008 1:41:33 PMPPART
Contact: Steve Hess. Ceiling inspection in "D" Phone #: ###-#### Internet Inspection Request from: Shelli Daylong ok to cover ceiling anop
ELE08-01814 Electrical Rough-In7/2/20087/2/20087/2/2008 12:37:52 PMPFAIL
Bonding and Underground Inspection For Spa Phone #: ###-#### Internet Inspection Request from: Jenni Keller called, left corr notice,NEC 680.10 shall not run u/g under spa, or shall be at depth per table for 680.10, no esc this project
ELE08-01384 Final7/1/20087/2/20087/2/2008 10:38:22 AMACANC
mike Phone #: ###-#### called, dog in yard, will recall, left card
ELE08-01807 Conference7/1/20087/2/20087/2/2008 10:15:59 AMADONE
larry Phone #: ###-#### reviewed when to call for inspection, 1 1/4", box fill, 6'-12' receptacle spacing, make-up, etc, no esc this project
ELE08-01466 Final7/1/20087/2/20087/2/2008 10:00:16 AMAPASS
Phone #: ###-#### Internet Inspection Request from: Lloyd Looney corrections made, ok to final, no card to sign, no esc this project
ELE08-01509 Electrical Rough-In7/1/20087/2/20087/2/2008 9:15:15 AMAPASS
Store front for suit # 182 Phone #: ###-#### Internet Inspection Request from: Lloyd Looney ric ok store-front only
ELE08-00898 Permanent Service7/1/20087/2/20087/2/2008 8:41:38 AMAPASS
Please call Barry at ###-#### for access into the building. Phone #: ###-#### Internet Inspection Request from: John Campbell p/s exst meter pak n ok, no esc this project
ELE08-00899 Permanent Service7/1/20087/2/20087/2/2008 8:40:08 AMAPASS
Please call Barry at ###-#### for access into the building. Phone #: ###-#### Internet Inspection Request from: John Campbell p/s exst meter pak n ok, no esc this project
ELE08-01029 Electrical Rough-In7/1/20087/2/20087/2/2008 8:07:08 AMAPART
Danny- ceiling Phone #: ###-#### ok to cover ceiling anop, west part building, northwest part ok to final this part, left correction notice to owner and the electrical permit. BCC no violations shall be retained-such as no lv wiring shall be on tiles or grid, conduits shall be supported, boxes closed, abandoned circuits closed,i.e. no live wiring exposed